Engineering, Management, Agriculture and Veterinary MCQs are now live. FPSC, PPSC, EPE, IELTS & GRE coming soon.
Question 1
A feasibility study for a proposed highway project mainly examines:
- pavement thickness, joint layout and surfacing type for the road
- contractor fleet size, bid price and equipment available for the works
- technical, economic and environmental/social viability
- land cost, compensation rates and legal ownership along the corridor
Show answer & solution
Answer: (C) technical, economic and environmental/social viability
A feasibility study decides whether a project should proceed by testing it on technical, economic and environmental/social grounds.
Question 2
Economic evaluation of a highway project compares construction and maintenance costs with benefits such as:
- rougher pavement surfaces and higher tyre replacement rates
- more traffic signals and longer waiting times at junctions
- a narrower right-of-way and lower land compensation costs
- savings in operating cost, travel time and accidents
Show answer & solution
Answer: (D) savings in operating cost, travel time and accidents
Road user benefits are mainly savings in vehicle operating cost, travel time and accident costs.
Question 3
Life-cycle cost analysis of pavement alternatives considers:
- initial construction cost alone, ignoring any later expenditure on the road
- initial cost plus the present value of future maintenance
- land acquisition and compensation cost alone, ignoring the pavement works
- first-year maintenance cost alone, ignoring the construction expenditure
Show answer & solution
Answer: (B) initial cost plus the present value of future maintenance
Life-cycle cost combines first cost with discounted future maintenance and rehabilitation costs over the analysis period.
Question 4
Parking studies are carried out mainly to determine:
- parking demand, supply and use in an area
- origin and destination of every trip made within a city
- speed distribution of the through traffic nearby
- structural strength of the pavement in parking areas
Show answer & solution
Answer: (A) parking demand, supply and use in an area
Parking surveys measure how much parking is demanded, how much is supplied and how intensively it is used.
Question 5
Postponing routine maintenance of a road generally leads to:
- small defects growing into costly major failures
- better skid resistance on the wearing course of the road
- longer service life for the pavement structure and surfacing
- a lower total life-cycle cost to the agency that owns the road
Show answer & solution
Answer: (A) small defects growing into costly major failures
Deferred maintenance lets small, cheap-to-fix defects progress into costly structural failures.
Question 6
The main purpose of highway maintenance is to:
- raise the design speed of the existing road to a higher class
- reduce the right-of-way width needed for the existing road
- remove the need for pavement design on later rehabilitation
- preserve the serviceability of the existing road
Show answer & solution
Answer: (D) preserve the serviceability of the existing road
Maintenance protects the large investment already made in the road by keeping it in serviceable condition.
Question 7
Contract administration of a highway project mainly involves:
- determining the subgrade CBR in the laboratory before design
- selecting the route alignment before the contract is awarded
- checking progress, quality and payments against the contract
- carrying out the traffic volume survey for the design stage
Show answer & solution
Answer: (C) checking progress, quality and payments against the contract
Contract administration checks that the work is built to the contract documents, on time and at the agreed cost.
Question 8
Intelligent Transportation Systems (ITS) apply:
- new bituminous mix designs to extend the service life of pavements
- information technology to improve transport safety and efficiency
- geosynthetic reinforcement to strengthen weak subgrade soils
- a revised functional classification of roads based on traffic volume
Show answer & solution
Answer: (B) information technology to improve transport safety and efficiency
ITS uses sensors, communication and information technology to manage traffic and inform road users.
Question 9
Highway asset management aims to:
- manage assets systematically at the lowest life-cycle cost
- manage only the traffic signal equipment across the network
- spend the entire budget on building brand new roads only
- replace every asset at fixed intervals whatever its condition is
Show answer & solution
Answer: (A) manage assets systematically at the lowest life-cycle cost
Asset management plans investment in pavements, bridges and other assets to optimize performance over their lives.
Question 10
Which of the following is a sustainable (green) highway practice?
- Using only virgin aggregates even when recycled material is available
- Reusing reclaimed asphalt in new layers
- Increasing haul distances of materials for contractor convenience
- Clearing all roadside vegetation from the right-of-way
Show answer & solution
Answer: (B) Reusing reclaimed asphalt in new layers
Reusing reclaimed materials cuts demand for virgin aggregate and reduces environmental impact.
Question 11
Chronic under-funding of highway maintenance mainly results in:
- a lower total cost to the road agency over the pavement life
- reduced vehicle operating costs for the users of the road
- steady deterioration needing costly rehabilitation
- an increase in pavement strength as the years go by
Show answer & solution
Answer: (C) steady deterioration needing costly rehabilitation
Without timely maintenance, roads deteriorate faster and need far more expensive repairs later.
Question 12
In Pakistan, major national arterial and inter-provincial roads are called:
- village roads
- feeder tracks
- urban streets
- highways
Show answer & solution
Answer: (D) highways
National arterial and inter-provincial roads are classed as highways.
Question 13
The importance of an efficient road network to a country's economy is comparable to that of:
- electrical wiring running through a building
- foundation piles supporting a building
- the roof protecting a structure
- arteries and veins in the human body
Show answer & solution
Answer: (D) arteries and veins in the human body
Like blood vessels, roads carry people and goods to every part of the economy.
Question 14
The historic Grand Trunk (G.T.) Road (N-5) across Pakistan was constructed in the era of:
- Emperor Shah Jahan (1628–1658 A.D.)
- Emperor Akbar (1556–1605 A.D.)
- Sher Shah Suri (1540–1545 A.D.)
- the British colonial administration
Show answer & solution
Answer: (C) Sher Shah Suri (1540–1545 A.D.)
Sher Shah Suri built the Grand Trunk Road during his reign (1540–1545 A.D.).
Question 15
National highways connecting provincial capitals and major ports in Pakistan are managed and maintained by the:
- National Highway Authority (NHA)
- Civil Aviation Authority of Pakistan
- local municipal corporations
- Pakistan Railways authority
Show answer & solution
Answer: (A) National Highway Authority (NHA)
The NHA is responsible for the national highway and motorway network.
Question 16
For transport in Pakistan, the largest share of passenger and freight movement is carried by:
- air transport
- roads
- railways
- inland waterways
Show answer & solution
Answer: (B) roads
Roads carry by far the greatest share of passenger and freight traffic in Pakistan.
Question 17
A road lying entirely within a municipal city or town boundary is called:
- a national highway
- a village road
- an urban road
- an inter-provincial motorway
Show answer & solution
Answer: (C) an urban road
Roads within municipal limits are classed as urban roads.
Question 18
City roads meant for continuous through traffic on primary routes are called:
- service roads
- collector streets
- local streets
- arterial streets
Show answer & solution
Answer: (D) arterial streets
Arterial streets carry the main through traffic flows of a city.
Question 19
Which road category generally carries the heaviest inter-city traffic across provinces?
- Urban local streets within cities
- National highways and motorways
- Village and feeder roads in rural areas
- District roads serving rural towns
Show answer & solution
Answer: (B) National highways and motorways
National highways and motorways form the main inter-city, inter-provincial network.
Question 20
A road linking rural towns and agricultural districts is commonly classified as a:
- provincial or district road
- city arterial street
- urban expressway route
- inter-provincial motorway
Show answer & solution
Answer: (A) provincial or district road
Roads serving rural towns and farming areas are provincial or district roads.
Question 21
Level of Service (LOS) is used to describe:
- structural condition of the pavement, graded from A to F
- ratio of benefits to costs, graded from A to F
- traffic flow quality, graded from A (best) to F (worst)
- accident rate per million vehicle-km, graded from A to F
Show answer & solution
Answer: (C) traffic flow quality, graded from A (best) to F (worst)
LOS grades traffic operating conditions such as speed, delay and comfort on a six-level scale.
Question 22
Access control on a highway means:
- limiting the axle loads that are allowed to use the road
- regulating where vehicles may enter and leave
- restricting every vehicle to one fixed maximum speed
- limiting the number of lanes provided on the carriageway
Show answer & solution
Answer: (B) regulating where vehicles may enter and leave
Access control limits entry and exit points to reduce conflicts with the through traffic.
Question 23
Compared with an uncontrolled-access road, a fully access-controlled highway offers:
- higher capacity and safety from fewer entering conflicts
- lower capacity because all traffic is forced into a single lane
- greater accident risk because of the frequent property access
- lower speeds because of the many side entries along the road
Show answer & solution
Answer: (A) higher capacity and safety from fewer entering conflicts
Removing direct property access removes many conflict points, improving flow and safety.
Question 24
A frontage (service) road mainly:
- carries the through traffic of the main highway in its place
- separates opposing traffic streams along the highway
- provides emergency stopping space for broken-down vehicles
- gives local access to adjoining properties off the main highway
Show answer & solution
Answer: (D) gives local access to adjoining properties off the main highway
Frontage roads collect local traffic and feed it to the main highway at controlled points.
Question 25
In modern highway planning, GIS and remote sensing are mainly used for:
- laboratory testing of bitumen samples from the site
- measuring vehicle axle loads on the road in service
- timing the traffic signals at busy intersections
- route selection and asset management
Show answer & solution
Answer: (D) route selection and asset management
GIS and satellite data help compare corridors, map assets and analyze spatial information.
Question 26
Traffic surveys are essential to highway planning because they provide:
- the strength of the subgrade soil along the route
- present and projected traffic volumes for design
- the rainfall intensity recorded at the site
- the chemical properties of the bitumen to be used
Show answer & solution
Answer: (B) present and projected traffic volumes for design
Traffic data underpin the geometric and pavement design of a road.
Question 27
Traffic forecasting is needed in highway design to ensure that the facility will:
- have enough capacity for the traffic expected in its design life
- have identical standards to every other road in the network
- need no maintenance at any time during its design life
- carry only present-day traffic without any allowance for growth
Show answer & solution
Answer: (A) have enough capacity for the traffic expected in its design life
Design must cater for future traffic growth over the design period, not only today's traffic.
Question 28
Which set of factors mainly governs the selection of a highway alignment?
- number of traffic signals and bus stops that are desired
- surface colour, type of signs and bridge railings used
- terrain, geology, cost, traffic and environmental impacts
- contractor preference and make of equipment available to the works
Show answer & solution
Answer: (C) terrain, geology, cost, traffic and environmental impacts
Alignment is chosen by balancing terrain, ground conditions, cost, traffic and impacts.
Question 29
An environmental impact assessment is required for major highway projects because:
- construction and operation affect drainage, noise and communities
- it replaces the need for geometric design of the road section
- it sets the toll rates that are charged to the road users
- it determines the pavement thickness for the design traffic loading
Show answer & solution
Answer: (A) construction and operation affect drainage, noise and communities
Highways can have significant environmental effects that need to be identified and mitigated.
Question 30
A toll road is a facility in which:
- only government vehicles are allowed to travel on it
- no maintenance is ever required over its life
- all vehicles are exempt from the posted speed limits
- users pay a fee that helps fund the road
Show answer & solution
Answer: (D) users pay a fee that helps fund the road
Tolls recover part of the cost of building, operating and maintaining the road.
Question 31
A public–private partnership (PPP) in highways involves:
- government building and running the road with no private role
- a public agency and a private firm sharing finance and risk
- a donor grant that never has to be repaid by anyone
- a private firm taking land without paying any compensation
Show answer & solution
Answer: (B) a public agency and a private firm sharing finance and risk
PPPs combine public and private resources and share the project risks.
Question 32
A dedicated road fund is created mainly to:
- bring all road user charges down to zero level
- fund only the purchase of land for new roads
- provide stable funding for road maintenance
- pay the salaries of toll plaza operators only
Show answer & solution
Answer: (C) provide stable funding for road maintenance
A road fund ring-fences revenue so maintenance is not starved by competing budget demands.
Question 33
Land acquisition for a new highway generally requires:
- no formal process because land for roads is free of cost
- a legal process with fair compensation to owners
- the approval of the contractor before any land is taken
- payment to owners only after the construction is complete
Show answer & solution
Answer: (B) a legal process with fair compensation to owners
Acquisition follows legal procedures and pays compensation to the landowners affected.
Question 34
Community engagement during highway planning is important mainly to:
- identify local concerns early and reduce delays
- set the design axle load for the pavement structure
- determine the design speed for the road section
- select the pavement material for the wearing course
Show answer & solution
Answer: (A) identify local concerns early and reduce delays
Early consultation brings out local issues so they can be addressed in the design.
Question 35
Widening a two-lane road to a four-lane divided highway is generally justified when:
- the existing road has no paved shoulders on either side
- traffic volume is far below the capacity of the existing road
- traffic volume approaches the capacity of the road
- the pavement surface has a few small potholes in places
Show answer & solution
Answer: (C) traffic volume approaches the capacity of the road
Widening is warranted when congestion and delay show the existing capacity is exhausted.