Question 1

Inadequate drainage of a highway can result in:

  1. a rise in subgrade strength and stiffness as moisture increases
  2. water build-up that weakens the pavement and subgrade
  3. a longer pavement life with fewer defects forming over time
  4. better skid resistance and a drier surface layer in all seasons
Show answer & solution

Answer: (B) water build-up that weakens the pavement and subgrade

Water is one of the main causes of premature pavement failure.

Question 2

Camber (cross slope) is provided on a road mainly to:

  1. counteract the centrifugal force acting on vehicles on curves
  2. reduce the longitudinal gradient along the road
  3. shed rain water quickly off the pavement surface
  4. increase the available sight distance over crests
Show answer & solution

Answer: (C) shed rain water quickly off the pavement surface

Camber drains water off the surface and reduces the risk of ponding and hydroplaning.

Question 3

The camber adopted for a road depends mainly on:

  1. the design speed together with the curve radius
  2. the traffic composition together with axle loads
  3. the subgrade CBR together with the layer thicknesses
  4. the type of pavement surface and the rainfall
Show answer & solution

Answer: (D) the type of pavement surface and the rainfall

Smooth impervious surfaces need less camber; rough or pervious ones and heavy rainfall need more.

Question 4

In areas of scanty rainfall and arid climate, the camber provided on a highway should be:

  1. flatter
  2. maximum possible
  3. reversed towards centre
  4. steeper
Show answer & solution

Answer: (A) flatter

Little rain needs little cross slope.

Question 5

Compared with a bituminous surface, an earth road needs a camber that is:

  1. steeper
  2. negligible
  3. flatter
  4. the same
Show answer & solution

Answer: (A) steeper

Earth roads are rougher and more pervious, so they need a steeper slope to shed water.

Question 6

The camber shapes commonly used for modern pavements are:

  1. V-shaped profiles with the lowest point at the centre
  2. flat profiles with no cross slope at the surface
  3. straight-line or parabolic crown profiles
  4. inverted crown profiles with the highest point at the edge
Show answer & solution

Answer: (C) straight-line or parabolic crown profiles

Cross-sections slope down from the crown to the edges.

Question 7

The surface drainage of a highway generally includes:

  1. kerb paint, road signs and lane markings
  2. camber, side drains and culverts
  3. dowel bars, tie bars and expansion joints
  4. prime coat, tack coat and seal coat layers
Show answer & solution

Answer: (B) camber, side drains and culverts

Surface water is shed by camber, collected in side drains and carried across the road by culverts.

Question 8

Side drains (roadside ditches) mainly serve to:

  1. support the pavement edge and prevent lateral spreading
  2. reduce the longitudinal gradient of the carriageway
  3. carry slow-moving vehicles clear of the main lanes
  4. collect surface water and carry it away to an outfall
Show answer & solution

Answer: (D) collect surface water and carry it away to an outfall

Side drains convey runoff to the outfall.

Question 9

Culverts mainly serve to:

  1. support the pavement layers and limit their settlement under traffic
  2. separate opposing streams of traffic on a divided carriageway
  3. carry a drainage channel's flow across or beneath the road
  4. reduce the camber of the carriageway where it crosses a stream
Show answer & solution

Answer: (C) carry a drainage channel's flow across or beneath the road

A culvert is a cross-drainage structure.

Question 10

The design discharge of a highway culvert is based on:

  1. the average daily traffic expected on the road in future
  2. the width of the carriageway and the number of lanes
  3. a fixed discharge value adopted for every culvert on the road
  4. a flood estimate for a chosen return period and road class
Show answer & solution

Answer: (D) a flood estimate for a chosen return period and road class

Higher-class roads are designed for rarer, larger floods.

Question 11

A higher design return period for a culvert means that it is designed for:

  1. rarer and larger floods
  2. a smaller catchment area
  3. lower rainfall intensities
  4. more frequent, smaller floods
Show answer & solution

Answer: (A) rarer and larger floods

A longer return period corresponds to a larger flood.

Question 12

Subsurface drainage measures are provided mainly to:

  1. support the wearing course against repeated wheel loads
  2. intercept groundwater that could weaken the pavement
  3. reduce the cross slope of the carriageway surface
  4. carry the surface runoff from the camber to the culverts
Show answer & solution

Answer: (B) intercept groundwater that could weaken the pavement

Subsurface drains lower the water table beneath the road.

Question 13

A typical subsurface drain consists of:

  1. a perforated pipe in a trench with graded filter material
  2. an open ditch lined with bitumen and crushed stone chips
  3. a kerb and channel running along the edge of the road
  4. a solid concrete box culvert laid under the carriageway
Show answer & solution

Answer: (A) a perforated pipe in a trench with graded filter material

The filter lets water in while preventing fine soil from entering the pipe.

Question 14

Camber alone, without functioning side drains and cross-drainage structures, is:

  1. sufficient under all rainfall and soil conditions on any road
  2. insufficient, since shed water must still be carried away
  3. harmful to the pavement structure and to its edges
  4. needed only on hill roads and on bridge decks
Show answer & solution

Answer: (B) insufficient, since shed water must still be carried away

Camber only moves water off the pavement; drains and culverts must remove it from the road corridor.

Question 15

Erosion of unlined side drains can be reduced by:

  1. steepening the drain so that the water flows away faster
  2. removing all vegetation from the banks of the drain
  3. lining vulnerable sections and adding check dams to slow flow
  4. narrowing the drain cross-section to raise the flow depth
Show answer & solution

Answer: (C) lining vulnerable sections and adding check dams to slow flow

Lower velocities and protected surfaces resist scour.

Question 16

A lined side drain is preferred over an unlined one where:

  1. the land is cheap and plentiful beside the road
  2. flows are very small and the ground is nearly flat
  3. the soil is cohesive and does not scour at all
  4. the gradient is steep and erosion is likely
Show answer & solution

Answer: (D) the gradient is steep and erosion is likely

Steep drains produce high velocity that erodes unlined channels.

Question 17

Cross-drainage on hill roads is particularly challenging because:

  1. steep terrain gives fast, high-energy flows across the road
  2. hill streams never carry any debris or boulders at all
  3. slopes make the flows slow, shallow and harmless
  4. culverts cannot be built on any sloping ground
Show answer & solution

Answer: (A) steep terrain gives fast, high-energy flows across the road

Torrential flows and debris need robust structures.

Question 18

Flash floods endanger highways mainly through:

  1. gradual drying out of the subgrade beneath the road
  2. inundation of low sections and washout of small structures
  3. a steady fall in traffic noise levels near the road
  4. a gain in pavement skid resistance after heavy rain
Show answer & solution

Answer: (B) inundation of low sections and washout of small structures

Adequately sized structures reduce the risk of washouts and closures.

Question 19

Climate change is considered in highway drainage design because:

  1. it removes the need for culverts on all hill roads
  2. it alters the colour and grain size of the subgrade soil
  3. it fixes the design speed to be adopted for the road
  4. it can change rainfall intensity and flood frequency
Show answer & solution

Answer: (D) it can change rainfall intensity and flood frequency

Future rainfall may differ from past records.

Question 20

Vegetation control along a roadside is needed mainly to:

  1. increase the camber of the pavement surface
  2. strengthen the soil of the subgrade layer
  3. keep drains clear and maintain sight distance
  4. avoid the need for culverts at stream crossings
Show answer & solution

Answer: (C) keep drains clear and maintain sight distance

Overgrowth blocks drains and obstructs visibility.

Question 21

On hill roads, a catch-water (intercepting) drain above the cut slope is provided to:

  1. carry the wheel loads of vehicles travelling on the hillside
  2. support the cut slope against sliding failure from above
  3. intercept hillside runoff before it reaches the cut slope
  4. collect only the water that is shed by the road camber
Show answer & solution

Answer: (C) intercept hillside runoff before it reaches the cut slope

It diverts hillside runoff to a safe outlet.

Question 22

Weep holes in retaining walls are provided to:

  1. relieve water pressure behind the wall
  2. reduce the self-weight of the wall itself and its footing
  3. increase the friction along the base of the wall
  4. allow the wall to expand freely in hot weather
Show answer & solution

Answer: (A) relieve water pressure behind the wall

Draining the backfill prevents build-up of hydrostatic pressure.

Question 23

Peak runoff estimated by the rational method depends on the:

  1. CBR value, traffic volume and the design axle load
  2. runoff coefficient, rainfall intensity and catchment area
  3. design speed, curve radius and the longitudinal gradient
  4. bitumen grade, aggregate size and mix density in the field
Show answer & solution

Answer: (B) runoff coefficient, rainfall intensity and catchment area

Q = CiA (with the suitable unit factor).

Question 24

Using the rational formula Q = CiA/360 (Q in m³/s, i in mm/h, A in hectares), the peak discharge for C = 0.6, i = 100 mm/h and A = 30 ha is:

  1. 50 m³/s
  2. 1.8 m³/s
  3. 0.5 m³/s
  4. 5.0 m³/s
Show answer & solution

Answer: (D) 5.0 m³/s

Q = 0.6 × 100 × 30 / 360 = 5.0 m³/s.

Question 25

The time of concentration of a catchment is the:

  1. interval between two successive storms at the same site
  2. duration of the rainstorm that falls on the catchment
  3. time for runoff from the farthest point to reach the outlet
  4. return period adopted for the design flood of a culvert
Show answer & solution

Answer: (C) time for runoff from the farthest point to reach the outlet

Design storm duration is usually taken equal to the time of concentration.

Question 26

Hydroplaning occurs when:

  1. a film of water separates the tyres from the pavement surface
  2. the camber on the carriageway is excessive
  3. the pavement texture is very coarse and rough
  4. the tyres overheat on a dry pavement surface
Show answer & solution

Answer: (A) a film of water separates the tyres from the pavement surface

Hydroplaning causes loss of steering and braking control.