Engineering, Management, Agriculture and Veterinary MCQs are now live. FPSC, PPSC, EPE, IELTS & GRE coming soon.

Rock Mechanics & Ground Control: Slope Stability

Mining Engineering · Rock Mechanics & Ground Control

37 questions, each with the answer and a worked solution.

Practice interactively and track your score →
Question 1

Which slope failure occurs when a block slides on a single discontinuity that dips out of the slope face?

  1. Plane failure
  2. Circular failure
  3. Toppling failure
  4. Wedge failure
Show answer & solution

Answer: (A) Plane failure

Plane failure needs a joint daylighting in the face and dipping steeper than its friction angle.

Question 2

Which conditions are needed for plane failure on a joint?

  1. Joint dips less steeply than its friction angle
  2. Joint dips steeply into the slope
  3. Joint strikes perpendicular to the face
  4. Joint strikes within about ±20° of the face, daylights in the face and dips steeper than its friction angle
Show answer & solution

Answer: (D) Joint strikes within about ±20° of the face, daylights in the face and dips steeper than its friction angle

These are the kinematic conditions given by Hoek and Bray.

Question 3

Which slope failure involves sliding along the line of intersection of two discontinuities?

  1. Toppling failure
  2. Plane failure
  3. Wedge failure
  4. Circular failure
Show answer & solution

Answer: (C) Wedge failure

A wedge slides when the line of intersection plunges out of the face steeper than the friction angle.

Question 4

Which slope failure involves forward rotation of rock columns formed by steep joints dipping into the slope?

  1. Plane failure
  2. Toppling failure
  3. Wedge failure
  4. Circular failure
Show answer & solution

Answer: (B) Toppling failure

Toppling occurs when the centre of gravity of a column lies outside its base.

Question 5

Which type of slope failure is common in heavily fractured rock, soil and waste dumps?

  1. Wedge failure
  2. Toppling failure
  3. Plane failure
  4. Circular failure
Show answer & solution

Answer: (D) Circular failure

Where there is no dominant structure, material fails along a curved (circular) slip surface.

Question 6

Which graphical tool is used for kinematic analysis of rock slope failure from joint orientation data?

  1. Stereographic projection
  2. Histogram
  3. Mohr circle
  4. Hodograph
Show answer & solution

Answer: (A) Stereographic projection

Stereonets show joint orientations relative to the slope face and friction cone.

Question 7

On a stereonet, how is a planar discontinuity commonly plotted as a single point?

  1. As its dip-direction arrow
  2. As its strike line
  3. As its pole
  4. As its great circle
Show answer & solution

Answer: (C) As its pole

The pole is the point where the normal to the plane intersects the hemisphere.

Question 8

Which stereographic net preserves area and is preferred for contouring joint poles?

  1. Polar grid
  2. Equal-angle (Wulff) net
  3. Equal-area (Schmidt) net
  4. Mercator net
Show answer & solution

Answer: (C) Equal-area (Schmidt) net

Equal-area projection gives unbiased pole densities for contouring.

Question 9

What is the factor of safety for a dry, cohesionless block resting on a plane inclined at ψ with friction angle φ?

  1. tan φ/tan ψ
  2. cos ψ/cos φ
  3. tan ψ/tan φ
  4. sin φ/sin ψ
Show answer & solution

Answer: (A) tan φ/tan ψ

FS = (W cos ψ tan φ)/(W sin ψ) = tan φ/tan ψ.

Question 10

What minimum factor of safety is commonly accepted for permanent open pit slopes?

  1. 0.8
  2. 1.0
  3. 1.3 to 1.5
  4. 3.0
Show answer & solution

Answer: (C) 1.3 to 1.5

Overall pit slopes are typically designed for FS of 1.3–1.5 depending on consequence of failure.

Question 11

Which method of slices for circular failure satisfies moment equilibrium and ignores interslice shear forces?

  1. Morgenstern–Price method
  2. Bishop's simplified method
  3. Janbu's simplified method
  4. Spencer's method
Show answer & solution

Answer: (B) Bishop's simplified method

Bishop's simplified method includes interslice normal forces but neglects interslice shear.

Question 12

Which method of slices satisfies both force and moment equilibrium?

  1. Bishop's simplified method
  2. Janbu's simplified method
  3. Ordinary (Fellenius) method
  4. Spencer's method
Show answer & solution

Answer: (D) Spencer's method

Spencer's method satisfies full equilibrium with parallel interslice forces.

Question 13

What is the angle from the horizontal of a line joining the toe to the crest of the whole pit wall called?

  1. Overall slope angle
  2. Inter-ramp angle
  3. Angle of repose
  4. Bench face angle
Show answer & solution

Answer: (A) Overall slope angle

The overall slope angle includes benches and ramps and controls stripping.

Question 14

What is the angle of an individual bench face in an open pit called?

  1. Inter-ramp angle
  2. Angle of draw
  3. Overall slope angle
  4. Bench face angle
Show answer & solution

Answer: (D) Bench face angle

The bench face angle is usually steeper than the overall slope angle.

Question 15

What is the flat strip left between benches to catch rock falling from above called?

  1. Crest
  2. Berm (catch bench)
  3. Toe
  4. Sump
Show answer & solution

Answer: (B) Berm (catch bench)

Catch berms protect lower benches and haul roads from rockfall.

Question 16

How does a tension crack behind the crest affect the stability of a rock slope?

  1. It increases stability
  2. It has no effect
  3. It only affects appearance
  4. It reduces stability, especially when filled with water
Show answer & solution

Answer: (D) It reduces stability, especially when filled with water

A tension crack reduces the sliding surface and allows water pressure to push the block.

Question 17

Which method of improving rock slope stability is generally the most effective and economical?

  1. Drainage to lower water pressure
  2. Heavier production blasting
  3. Adding load at the crest
  4. Steepening the slope
Show answer & solution

Answer: (A) Drainage to lower water pressure

Lowering water pressure increases effective stress and shear strength at low cost.

Question 18

What is the main purpose of horizontal drain holes drilled into a pit wall?

  1. To install rock bolts
  2. To lower water pressure behind the slope
  3. To act as survey stations
  4. To hold explosives
Show answer & solution

Answer: (B) To lower water pressure behind the slope

Horizontal drains relieve pore and joint water pressure.

Question 19

Which controlled blasting technique produces a smooth final pit wall with minimum damage?

  1. Bulk production blasting
  2. Secondary blasting
  3. Pre-splitting
  4. Toe blasting
Show answer & solution

Answer: (C) Pre-splitting

Closely spaced, lightly charged holes are fired first to form a crack along the final wall.

Question 20

Which instrument measures subsurface lateral movement of a slope through a cased borehole?

  1. Inclinometer
  2. Seismograph
  3. Piezometer
  4. Extensometer
Show answer & solution

Answer: (A) Inclinometer

An inclinometer probe measures tilt along the casing, locating the shear surface.

Question 21

Which instrument measures water pressure within a slope?

  1. Inclinometer
  2. Load cell
  3. Extensometer
  4. Piezometer
Show answer & solution

Answer: (D) Piezometer

Piezometers measure pore water pressure at a point.

Question 22

Which monitoring system scans a pit wall continuously to detect millimetre movements over a large area?

  1. Inclinometer
  2. Piezometer
  3. Slope stability radar
  4. Abney level
Show answer & solution

Answer: (C) Slope stability radar

Ground-based radar gives real-time deformation maps and early warning.

Question 23

What does an accelerating rate of displacement in slope monitoring generally indicate?

  1. Onset of the dry season
  2. Approaching failure
  3. Only an instrument fault
  4. Slope stabilisation
Show answer & solution

Answer: (B) Approaching failure

Progressive acceleration of movement is a key warning sign of collapse.

Question 24

Which method predicts the time of slope failure by plotting inverse velocity against time?

  1. Bishop's method
  2. Kirsch method
  3. Markland test
  4. Fukuzono inverse velocity method
Show answer & solution

Answer: (D) Fukuzono inverse velocity method

Inverse velocity trends towards zero as failure approaches; extrapolation gives failure time.

Question 25

What is Markland's test used for?

  1. Measuring water flow
  2. Predicting blast vibration
  3. Checking the kinematic possibility of plane and wedge failure on a stereonet
  4. Measuring rock strength
Show answer & solution

Answer: (C) Checking the kinematic possibility of plane and wedge failure on a stereonet

Markland (1972) compared joint intersections with the slope face and friction angle.

Question 26

What is the steepest angle at which loose, dry broken material comes to rest called?

  1. Friction angle
  2. Angle of repose
  3. Dip angle
  4. Overall slope angle
Show answer & solution

Answer: (B) Angle of repose

Waste dumps formed by end-tipping stand at the angle of repose.

Question 27

What is the typical angle of repose of loose broken rock in waste dumps?

  1. 10° to 15°
  2. 35° to 38°
  3. 60° to 70°
  4. 85° to 90°
Show answer & solution

Answer: (B) 35° to 38°

End-tipped run-of-mine waste usually stands at about 35°–38°.

Question 28

Which factor increases the driving force on a slope during an earthquake?

  1. Horizontal seismic acceleration
  2. Drainage of the slope
  3. Flattening of the slope
  4. Unloading of the crest
Show answer & solution

Answer: (A) Horizontal seismic acceleration

Pseudo-static analysis adds a horizontal force kW to the sliding mass.

Question 29

Which slope reinforcement uses tensioned steel tendons grouted into stable rock behind the face?

  1. Shotcrete alone
  2. Horizontal drains
  3. Rock anchors (cable anchors)
  4. Vegetation
Show answer & solution

Answer: (C) Rock anchors (cable anchors)

Tensioned anchors add normal force and resisting force on the sliding plane.

Question 30

What is draped rockfall mesh mainly used for on a rock slope?

  1. Draining water from the slope
  2. Stopping deep-seated slope failure
  3. Holding explosives in place
  4. Guiding falling rocks safely down to the toe
Show answer & solution

Answer: (D) Guiding falling rocks safely down to the toe

Drape mesh controls small loose rocks but does not stop large slides.

Question 31

How does removing material from the crest of a slope affect its stability?

  1. It increases the factor of safety
  2. It reduces the factor of safety
  3. It has no effect
  4. It causes toppling
Show answer & solution

Answer: (A) It increases the factor of safety

Unloading the crest reduces the driving weight of the potential sliding mass.

Question 32

What is commonly assumed in back analysis of a slope that has already failed?

  1. The factor of safety was 2.0
  2. The rock had no friction
  3. Water pressure was zero
  4. The factor of safety was 1.0 at the moment of failure
Show answer & solution

Answer: (D) The factor of safety was 1.0 at the moment of failure

Setting FS = 1 allows realistic strength parameters to be calculated.

Question 33

In an open pit, what is the slope angle between two haul ramps, measured toe to crest, called?

  1. Angle of repose
  2. Overall slope angle
  3. Inter-ramp slope angle
  4. Bench face angle
Show answer & solution

Answer: (C) Inter-ramp slope angle

The inter-ramp angle excludes ramps and is steeper than the overall angle.

Question 34

Why are steeper pit slopes economically attractive?

  1. They reduce waste stripping and the stripping ratio
  2. They lower the ore grade
  3. They lengthen haul roads
  4. They increase waste removal
Show answer & solution

Answer: (A) They reduce waste stripping and the stripping ratio

Each degree of steepening can save millions of tonnes of waste in a large pit.

Question 35

What cohesion is normally assumed for a clean, unfilled planar joint in slope design?

  1. Equal to the tensile strength
  2. Zero
  3. Equal to the rock UCS
  4. Very high
Show answer & solution

Answer: (B) Zero

Clean joints are usually treated as cohesionless, relying on friction only.

Question 36

Which geological condition favours toppling failure in a rock slope?

  1. Steep joints dipping into the slope with strike nearly parallel to the face
  2. Joints dipping gently out of the face
  3. Massive unjointed rock
  4. Horizontal bedding with no cross joints
Show answer & solution

Answer: (A) Steep joints dipping into the slope with strike nearly parallel to the face

Steep inward-dipping joints form columns that can rotate outwards.

Question 37

Which large open pit lignite mine in Sindh, Pakistan, requires extensive dewatering and slope design in weak overburden sediments?

  1. Duki coal mines
  2. Saindak copper–gold mine
  3. Thar Coalfield Block-II mine
  4. Khewra Salt Mine
Show answer & solution

Answer: (C) Thar Coalfield Block-II mine

The Thar Block-II open pit removes thick sandstone and claystone overburden with large aquifers.

Practice these 37 questions interactively →