What is a load curve?
Show answer & solution
Answer: (C) A graph showing the variation of electrical load with time
The area under it gives the energy consumed.
Mechanical Engineering · Power Plant Engineering
25 questions, each with the answer and a worked solution.
Practice interactively and track your score →What is a load curve?
Answer: (C) A graph showing the variation of electrical load with time
The area under it gives the energy consumed.
What is a load duration curve?
Answer: (A) A curve showing loads arranged in descending order of magnitude against the time for which they occur
It helps select base and peak load plants.
What is load factor?
Answer: (B) The ratio of average load to maximum demand over a period
A high load factor reduces the cost per unit generated.
What is demand factor?
Answer: (C) The ratio of maximum demand to connected load
It is usually less than 1.
What is diversity factor?
Answer: (A) The ratio of the sum of individual maximum demands to the maximum demand of the whole system
It is greater than 1, because consumers do not all peak at once.
What is plant capacity factor?
Answer: (D) The ratio of actual energy produced to the maximum energy that could be produced at rated capacity in the same period
It shows how fully the plant is used.
What is utilisation factor?
Answer: (A) The ratio of maximum demand on a plant to its rated capacity
It shows how much of the installed capacity is used at peak.
A plant has a maximum demand of 100 MW and an average load of 60 MW. What is its load factor?
Answer: (B) 60%
Load factor = 60 ÷ 100.
Which plants are usually used to supply base load?
Answer: (C) Nuclear, large coal and run-of-river hydro plants
They have low running cost and work best at steady output.
Which plants are usually used to supply peak load?
Answer: (D) Gas turbines, storage hydro and pumped storage plants
They can start and change load quickly.
What are fixed costs of a power plant?
Answer: (A) Costs such as interest on capital, depreciation, taxes and insurance that do not depend on energy generated
Operating costs depend on the energy generated.
What is a two-part tariff?
Answer: (B) A tariff with a fixed charge based on maximum demand plus a running charge based on energy consumed
It is commonly used for industrial consumers.
Why is power factor improvement important for power plants?
Answer: (C) A low power factor increases current, losses and the size of equipment needed for the same real power
Capacitors are used to improve power factor.
What is the main advantage of interconnecting power stations in a grid?
Answer: (D) Better reliability, reduced reserve capacity and economical sharing of load
Pakistan's national grid is operated by the national transmission company.
Which organisation regulates electricity tariffs in Pakistan?
Answer: (B) NEPRA (National Electric Power Regulatory Authority)
It sets tariffs and licenses power companies.
What is connected load?
Answer: (B) The sum of the rated capacities of all electrical appliances connected to the supply
Maximum demand is usually less than connected load.
What is maximum demand?
Answer: (A) The highest load drawn by a consumer or system during a given period
It decides the size of generating plant needed.
What is reserve capacity of a power station?
Answer: (B) Installed capacity in excess of maximum demand, kept for breakdowns, maintenance and future growth
Spinning reserve is capacity kept running and ready.
What is the effect of a high load factor on the cost of generation?
Answer: (A) It reduces the cost per unit of energy
Fixed costs are spread over more units.
What is depreciation in power plant economics?
Answer: (C) The decrease in value of plant and equipment with time, for which money is set aside
Straight-line and sinking-fund methods are common.
What is a flat-rate tariff?
Answer: (D) A tariff in which a fixed rate is charged per unit of energy consumed
It is simple but does not reflect the cost of supply.
What is a block-rate tariff?
Answer: (C) A tariff in which energy is charged at different rates for successive blocks of consumption
Pakistani domestic tariffs use slabs of units.
What is a peak load plant?
Answer: (B) A plant that runs only during periods of highest demand
Peaking plants have low capital cost but may have higher running cost.
What is the plant use factor?
Answer: (D) The ratio of energy produced to the product of plant capacity and the hours the plant actually operated
It shows how fully the plant is used while running.
Why is a load duration curve useful in plant selection?
Answer: (A) It shows how long each level of load lasts, helping divide demand between base and peak plants
The bottom part represents base load and the top part peak load.