What is the basic formula for hydroelectric power?
Show answer & solution
Answer: (B) P = ρgQHη
Q is discharge, H is net head and η is overall efficiency.
Mechanical Engineering · Power Plant Engineering
33 questions, each with the answer and a worked solution.
Practice interactively and track your score →What is the basic formula for hydroelectric power?
Answer: (B) P = ρgQHη
Q is discharge, H is net head and η is overall efficiency.
Which is the largest hydroelectric power station in Pakistan?
Answer: (B) Tarbela
Tarbela Dam is on the Indus River in Khyber Pakhtunkhwa.
On which river is the Mangla Dam built?
Answer: (C) Jhelum
It is located in Azad Jammu and Kashmir.
What type of hydropower project is Ghazi Barotha?
Answer: (A) A run-of-river project on the Indus that uses a power channel from a barrage
It uses water released from Tarbela.
On which river is the Warsak hydropower project located?
Answer: (D) Kabul River
It is near Peshawar.
What is the Neelum–Jhelum hydropower project?
Answer: (A) A run-of-river project that diverts water of the Neelum River through a tunnel to the Jhelum
It was completed in 2018.
Which organisation is responsible for developing large hydropower projects in Pakistan?
Answer: (C) WAPDA (Water and Power Development Authority)
NEPRA is the electricity regulator.
What is a run-of-river hydro plant?
Answer: (D) A plant that uses river flow as it comes, with little or no storage
Its output varies with river flow.
What is a pumped storage plant?
Answer: (B) A plant that pumps water to an upper reservoir during low demand and generates power during peak demand
It works like a large battery for the grid.
How are hydro plants classified by head?
Answer: (A) Low head, medium head and high head
Low-head plants use Kaplan turbines and high-head plants Pelton wheels.
Which turbine is suitable for a high-head hydro plant (above about 300 m)?
Answer: (D) Pelton wheel
Impulse turbines suit high heads and low flows.
Which turbine is suitable for a low-head hydro plant with large discharge?
Answer: (C) Kaplan turbine
Kaplan turbines have adjustable blades.
Which turbine is suitable for medium heads?
Answer: (B) Francis turbine
Tarbela and Mangla use Francis turbines.
What is the function of a spillway in a dam?
Answer: (D) To pass surplus flood water safely downstream
Spillways protect the dam from overtopping.
What is the function of a penstock?
Answer: (A) To carry water under pressure from the reservoir or forebay to the turbines
It must withstand water hammer pressures.
What is the function of a surge tank?
Answer: (C) To reduce water hammer and absorb sudden pressure changes when turbine load changes
It is placed between the tunnel and penstock.
What is the function of a draft tube in a hydro plant?
Answer: (B) To recover kinetic energy from water leaving a reaction turbine and allow the turbine to be set above tailwater
It is used with Francis and Kaplan turbines.
What is the tailrace?
Answer: (C) The channel that carries water away from the power house after it leaves the turbines
Tailwater level affects net head.
What are the main advantages of hydroelectric power?
Answer: (A) No fuel cost, low running cost, quick starting and long plant life
Hydro plants are ideal for meeting peak loads.
What are the main disadvantages of hydroelectric power?
Answer: (D) High capital cost, long construction time, dependence on rainfall and sedimentation of reservoirs
Siltation reduces the storage of Tarbela and Mangla over time.
What is a hydrograph?
Answer: (B) A graph showing river discharge against time
It is used to plan reservoir and plant capacity.
What is a flow duration curve?
Answer: (C) A curve showing the percentage of time that river flow equals or exceeds given values
It helps decide firm power and installed capacity.
What is a mass curve used for in hydro planning?
Answer: (D) Finding the reservoir storage needed to provide a given regulated flow
It plots cumulative flow against time.
What is the gross head of a hydro plant?
Answer: (A) The difference between headwater level and tailwater level
Net head = gross head − losses.
Why are hydro plants suitable for peak load supply?
Answer: (B) They can start, stop and change load very quickly
Storage hydro plants follow demand easily.
What is the net head of a hydro plant?
Answer: (C) The gross head minus head losses in the intake, tunnel and penstock
Turbines are rated on net head.
What is an intake structure in a hydro plant?
Answer: (D) The entry point where water is drawn from the reservoir into the tunnel or penstock
Trash racks keep debris out of the intake.
What is the function of a trash rack?
Answer: (A) To prevent floating debris from entering the turbines
It is placed at the intake.
What is a forebay?
Answer: (B) A small pond at the end of a power canal that supplies water steadily to the penstocks
It acts as a small regulating reservoir.
Why is siltation a serious problem for dams in Pakistan?
Answer: (D) Heavy sediment loads in rivers like the Indus reduce reservoir storage capacity over time
Sediment management is important for Tarbela.
What is the main purpose of Tarbela and Mangla dams apart from power generation?
Answer: (B) Storing water for irrigation and controlling floods
They are multipurpose projects.
What is mini or micro hydro power?
Answer: (C) Small hydro plants, often run-of-river, supplying local communities
They are common in the northern areas of Pakistan.
What is the specific speed of a turbine used for in hydro plant design?
Answer: (A) Selecting the type of turbine suited to the available head and discharge
Low specific speed suits Pelton and high specific speed suits Kaplan.