What is the stripping ratio in surface mining?
Show answer & solution
Answer: (B) Ratio of waste removed to ore mined
Stripping ratio = waste/ore, in tonnes or volume per tonne.
Mining Engineering · Surface Mining
37 questions, each with the answer and a worked solution.
Practice interactively and track your score →What is the stripping ratio in surface mining?
Answer: (B) Ratio of waste removed to ore mined
Stripping ratio = waste/ore, in tonnes or volume per tonne.
In which units is the stripping ratio in surface coal mining often expressed?
Answer: (D) Cubic metres of overburden per tonne of coal
Coal stripping ratios are commonly quoted as m³ of overburden per tonne of coal.
What is the break-even stripping ratio?
Answer: (C) The maximum stripping ratio at which mining is just economic
Above the break-even ratio, the cost of waste removal exceeds the profit from the ore.
How is the break-even stripping ratio calculated?
Answer: (A) (Recoverable value per tonne of ore − cost per tonne of mining and processing ore) ÷ stripping cost per tonne of waste
Profit available per tonne of ore pays for the waste removed.
If ore is worth Rs 5,000 per tonne, producing it costs Rs 3,000 per tonne and waste removal costs Rs 400 per tonne, what is the break-even stripping ratio?
Answer: (B) 5
(5000 − 3000)/400 = 5 tonnes of waste per tonne of ore.
What is the overall stripping ratio of a pit?
Answer: (D) Total waste in the pit divided by total ore in the pit
The overall ratio is a life-of-mine average.
What is the instantaneous stripping ratio?
Answer: (C) Ratio of waste to ore at a given time or in a given period
It changes as mining moves through pushbacks.
Which stripping strategy removes waste early, giving high costs at the start and lower costs later?
Answer: (B) Declining stripping ratio method
Mining each bench to its final limit early produces a declining ratio.
Which stripping strategy delays waste removal and improves early cash flow?
Answer: (A) Increasing stripping ratio method
Pushbacks mined late increase the stripping ratio over time.
Which stripping strategy keeps waste removal roughly uniform over the life of the mine?
Answer: (C) Constant stripping ratio method
A constant ratio gives an even fleet size and workforce.
What generally happens to the stripping ratio as an open pit deepens in a dipping orebody?
Answer: (D) It increases
Each deeper bench needs a wider band of waste to be removed above it.
If 12 million tonnes of waste are removed to mine 3 million tonnes of ore, what is the stripping ratio?
Answer: (B) 4:1
12/3 = 4 tonnes of waste per tonne of ore.
What is overburden?
Answer: (C) Soil and rock lying above a mineral deposit
Overburden must be removed to expose the deposit.
What is the waste rock between two coal seams in a multi-seam surface mine called?
Answer: (D) Interburden (parting)
Interburden is removed between the seams being mined.
What is pre-stripping?
Answer: (A) Removal of overburden before ore production begins
Pre-stripping is a capital cost incurred before revenue starts.
What is the main purpose of stripping and storing topsoil before mining?
Answer: (A) To reuse it for land reclamation
Topsoil contains seeds and nutrients needed to re-vegetate the land.
Which stripping ratio is used to decide whether a block at the pit edge is worth mining?
Answer: (D) Break-even stripping ratio
Pit limits are set where the incremental ratio equals the break-even ratio.
Why is the stripping ratio important in surface mining economics?
Answer: (C) Waste removal is often the largest operating cost
A high ratio can make an otherwise rich deposit uneconomic.
In surface coal mining, what does a stripping ratio of 10 m³/t mean?
Answer: (B) 10 cubic metres of overburden must be removed for each tonne of coal
Coal stripping ratios compare overburden volume with coal tonnage.
What is swell (bulking) of blasted overburden?
Answer: (C) The increase in volume when rock is broken
Broken rock has voids between pieces and occupies more space.
What is the percentage swell if 1 bank cubic metre of rock becomes 1.4 loose cubic metres?
Answer: (B) 40%
Percentage swell = (1.4 − 1)/1 × 100 = 40%.
What is the load factor in earthmoving?
Answer: (D) Ratio of bank volume to loose volume
Load factor converts loose volumes back to bank volumes.
If the percentage swell of overburden is 25%, what is its load factor?
Answer: (C) 0.8
Load factor = 1/(1 + 0.25) = 0.8.
What is a bank cubic metre (BCM)?
Answer: (A) One cubic metre of material in its natural in-situ state
Bank volume is measured before any disturbance.
What is a loose cubic metre (LCM)?
Answer: (A) One cubic metre of material after excavation
Loose volume includes voids created by breaking.
Which volume is normally used for measuring and paying for overburden removal?
Answer: (B) Bank cubic metres
Bank volume is surveyed reliably before and after mining.
What is the loose volume of 1,000 BCM of overburden with a swell of 30%?
Answer: (C) 1,300 LCM
1000 × 1.3 = 1300 loose cubic metres.
What is the highwall in a strip or open pit mine?
Answer: (D) The unexcavated face of overburden and coal exposed in the cut
The highwall stands opposite the spoil side of a strip.
What is spoil in strip mining?
Answer: (A) Overburden placed in the mined-out cut
Spoil piles are later reshaped for reclamation.
What is rehandle in dragline strip mining?
Answer: (D) Spoil that has to be dug and moved a second time
Rehandle increases dragline workload and cost.
Which feature of a dragline mainly limits the overburden thickness it can handle by simple side casting?
Answer: (B) Its dump radius and dump height
Longer booms give a larger reach and dump height.
What is the key cut in dragline strip mining?
Answer: (C) A narrow initial cut along the highwall toe that forms the new highwall
The key cut sets a stable highwall for the rest of the strip.
What is cast blasting in strip mines?
Answer: (B) Blasting that throws a large part of the overburden directly into the mined-out pit
High-energy blasts move 20–40% of overburden into its final position.
What is the main benefit of cast blasting?
Answer: (D) It reduces the overburden that must be moved by draglines or trucks
Material cast by explosives does not need to be handled by equipment.
Which surface mining system mines overburden in benches with shovels and trucks hauling it to dumps, as used at Thar Block-II?
Answer: (A) Truck-and-shovel open cast mining
Truck-and-shovel systems are flexible for thick and variable overburden.
What is the effect of a lower stripping cost per tonne on the break-even stripping ratio?
Answer: (B) It increases the break-even stripping ratio
Cheaper waste removal allows more waste to be moved per tonne of ore.
Which ratio compares the cost of removing one tonne of waste with the profit from one tonne of ore at the pit edge?
Answer: (D) Incremental (marginal) stripping ratio
Pit limits are set where the incremental ratio reaches the break-even value.