Surface Mining: Stripping Ratio

Mining Engineering · Surface Mining

37 questions, each with the answer and a worked solution.

Practice interactively and track your score →
Question 1

What is the stripping ratio in surface mining?

  1. Ratio of ore grade to cut-off grade
  2. Ratio of waste removed to ore mined
  3. Ratio of waste to total material
  4. Ratio of ore mined to waste removed
Show answer & solution

Answer: (B) Ratio of waste removed to ore mined

Stripping ratio = waste/ore, in tonnes or volume per tonne.

Question 2

In which units is the stripping ratio in surface coal mining often expressed?

  1. Kilograms per metre
  2. Metres per second
  3. Tonnes of coal per cubic metre of overburden
  4. Cubic metres of overburden per tonne of coal
Show answer & solution

Answer: (D) Cubic metres of overburden per tonne of coal

Coal stripping ratios are commonly quoted as m³ of overburden per tonne of coal.

Question 3

What is the break-even stripping ratio?

  1. The minimum ratio for any mine
  2. The average ratio of the pit
  3. The maximum stripping ratio at which mining is just economic
  4. The ratio at the start of mining
Show answer & solution

Answer: (C) The maximum stripping ratio at which mining is just economic

Above the break-even ratio, the cost of waste removal exceeds the profit from the ore.

Question 4

How is the break-even stripping ratio calculated?

  1. (Recoverable value per tonne of ore − cost per tonne of mining and processing ore) ÷ stripping cost per tonne of waste
  2. Waste tonnes ÷ total tonnes
  3. Ore value × stripping cost
  4. Stripping cost ÷ ore value
Show answer & solution

Answer: (A) (Recoverable value per tonne of ore − cost per tonne of mining and processing ore) ÷ stripping cost per tonne of waste

Profit available per tonne of ore pays for the waste removed.

Question 5

If ore is worth Rs 5,000 per tonne, producing it costs Rs 3,000 per tonne and waste removal costs Rs 400 per tonne, what is the break-even stripping ratio?

  1. 2
  2. 5
  3. 8
  4. 12.5
Show answer & solution

Answer: (B) 5

(5000 − 3000)/400 = 5 tonnes of waste per tonne of ore.

Question 6

What is the overall stripping ratio of a pit?

  1. Waste at the pit edge divided by ore
  2. Ore divided by waste
  3. Waste mined this month divided by ore mined this month
  4. Total waste in the pit divided by total ore in the pit
Show answer & solution

Answer: (D) Total waste in the pit divided by total ore in the pit

The overall ratio is a life-of-mine average.

Question 7

What is the instantaneous stripping ratio?

  1. Ratio of topsoil to subsoil
  2. Total life-of-mine ratio
  3. Ratio of waste to ore at a given time or in a given period
  4. Ratio at the ultimate pit limit only
Show answer & solution

Answer: (C) Ratio of waste to ore at a given time or in a given period

It changes as mining moves through pushbacks.

Question 8

Which stripping strategy removes waste early, giving high costs at the start and lower costs later?

  1. Increasing stripping ratio method
  2. Declining stripping ratio method
  3. Zero stripping method
  4. Constant stripping ratio method
Show answer & solution

Answer: (B) Declining stripping ratio method

Mining each bench to its final limit early produces a declining ratio.

Question 9

Which stripping strategy delays waste removal and improves early cash flow?

  1. Increasing stripping ratio method
  2. Zero stripping method
  3. Constant stripping ratio method
  4. Declining stripping ratio method
Show answer & solution

Answer: (A) Increasing stripping ratio method

Pushbacks mined late increase the stripping ratio over time.

Question 10

Which stripping strategy keeps waste removal roughly uniform over the life of the mine?

  1. Random stripping method
  2. Increasing stripping ratio method
  3. Constant stripping ratio method
  4. Declining stripping ratio method
Show answer & solution

Answer: (C) Constant stripping ratio method

A constant ratio gives an even fleet size and workforce.

Question 11

What generally happens to the stripping ratio as an open pit deepens in a dipping orebody?

  1. It becomes zero
  2. It stays constant
  3. It decreases
  4. It increases
Show answer & solution

Answer: (D) It increases

Each deeper bench needs a wider band of waste to be removed above it.

Question 12

If 12 million tonnes of waste are removed to mine 3 million tonnes of ore, what is the stripping ratio?

  1. 0.25:1
  2. 4:1
  3. 9:1
  4. 36:1
Show answer & solution

Answer: (B) 4:1

12/3 = 4 tonnes of waste per tonne of ore.

Question 13

What is overburden?

  1. Gangue minerals within ore
  2. The ore itself
  3. Soil and rock lying above a mineral deposit
  4. Tailings from the plant
Show answer & solution

Answer: (C) Soil and rock lying above a mineral deposit

Overburden must be removed to expose the deposit.

Question 14

What is the waste rock between two coal seams in a multi-seam surface mine called?

  1. Tailings
  2. Overburden
  3. Goaf
  4. Interburden (parting)
Show answer & solution

Answer: (D) Interburden (parting)

Interburden is removed between the seams being mined.

Question 15

What is pre-stripping?

  1. Removal of overburden before ore production begins
  2. Secondary blasting of boulders
  3. Final cleaning of the pit floor
  4. Removing ore before waste
Show answer & solution

Answer: (A) Removal of overburden before ore production begins

Pre-stripping is a capital cost incurred before revenue starts.

Question 16

What is the main purpose of stripping and storing topsoil before mining?

  1. To reuse it for land reclamation
  2. To use it for blasting
  3. To build haul roads
  4. To sell it as ore
Show answer & solution

Answer: (A) To reuse it for land reclamation

Topsoil contains seeds and nutrients needed to re-vegetate the land.

Question 17

Which stripping ratio is used to decide whether a block at the pit edge is worth mining?

  1. Zero stripping ratio
  2. Instantaneous stripping ratio
  3. Overall stripping ratio
  4. Break-even stripping ratio
Show answer & solution

Answer: (D) Break-even stripping ratio

Pit limits are set where the incremental ratio equals the break-even ratio.

Question 18

Why is the stripping ratio important in surface mining economics?

  1. It has no relation to cost
  2. It decides the ore grade
  3. Waste removal is often the largest operating cost
  4. It decides the rainfall
Show answer & solution

Answer: (C) Waste removal is often the largest operating cost

A high ratio can make an otherwise rich deposit uneconomic.

Question 19

In surface coal mining, what does a stripping ratio of 10 m³/t mean?

  1. 10 tonnes of coal are produced per cubic metre
  2. 10 cubic metres of overburden must be removed for each tonne of coal
  3. The coal seam is 10 m thick
  4. The pit is 10 m deep
Show answer & solution

Answer: (B) 10 cubic metres of overburden must be removed for each tonne of coal

Coal stripping ratios compare overburden volume with coal tonnage.

Question 20

What is swell (bulking) of blasted overburden?

  1. A decrease in volume when rock is broken
  2. An increase in weight of the rock
  3. The increase in volume when rock is broken
  4. Absorption of water by rock
Show answer & solution

Answer: (C) The increase in volume when rock is broken

Broken rock has voids between pieces and occupies more space.

Question 21

What is the percentage swell if 1 bank cubic metre of rock becomes 1.4 loose cubic metres?

  1. 14%
  2. 40%
  3. 71%
  4. 140%
Show answer & solution

Answer: (B) 40%

Percentage swell = (1.4 − 1)/1 × 100 = 40%.

Question 22

What is the load factor in earthmoving?

  1. Ratio of weight to volume
  2. Ratio of truck payload to bucket size
  3. Ratio of loose volume to bank volume
  4. Ratio of bank volume to loose volume
Show answer & solution

Answer: (D) Ratio of bank volume to loose volume

Load factor converts loose volumes back to bank volumes.

Question 23

If the percentage swell of overburden is 25%, what is its load factor?

  1. 0.25
  2. 0.75
  3. 0.8
  4. 1.25
Show answer & solution

Answer: (C) 0.8

Load factor = 1/(1 + 0.25) = 0.8.

Question 24

What is a bank cubic metre (BCM)?

  1. One cubic metre of material in its natural in-situ state
  2. One cubic metre after excavation
  3. The volume of one truck body
  4. One cubic metre after compaction
Show answer & solution

Answer: (A) One cubic metre of material in its natural in-situ state

Bank volume is measured before any disturbance.

Question 25

What is a loose cubic metre (LCM)?

  1. One cubic metre of material after excavation
  2. One cubic metre after compaction
  3. One cubic metre of water
  4. One cubic metre in situ
Show answer & solution

Answer: (A) One cubic metre of material after excavation

Loose volume includes voids created by breaking.

Question 26

Which volume is normally used for measuring and paying for overburden removal?

  1. Loose cubic metres
  2. Bank cubic metres
  3. Compacted cubic metres
  4. Number of truck loads only
Show answer & solution

Answer: (B) Bank cubic metres

Bank volume is surveyed reliably before and after mining.

Question 27

What is the loose volume of 1,000 BCM of overburden with a swell of 30%?

  1. 770 LCM
  2. 1,030 LCM
  3. 1,300 LCM
  4. 3,000 LCM
Show answer & solution

Answer: (C) 1,300 LCM

1000 × 1.3 = 1300 loose cubic metres.

Question 28

What is the highwall in a strip or open pit mine?

  1. The spoil pile
  2. The haul ramp
  3. The safety berm
  4. The unexcavated face of overburden and coal exposed in the cut
Show answer & solution

Answer: (D) The unexcavated face of overburden and coal exposed in the cut

The highwall stands opposite the spoil side of a strip.

Question 29

What is spoil in strip mining?

  1. Overburden placed in the mined-out cut
  2. Coal awaiting loading
  3. Plant tailings
  4. Topsoil
Show answer & solution

Answer: (A) Overburden placed in the mined-out cut

Spoil piles are later reshaped for reclamation.

Question 30

What is rehandle in dragline strip mining?

  1. The first cut of overburden
  2. Topsoil
  3. Coal loaded twice
  4. Spoil that has to be dug and moved a second time
Show answer & solution

Answer: (D) Spoil that has to be dug and moved a second time

Rehandle increases dragline workload and cost.

Question 31

Which feature of a dragline mainly limits the overburden thickness it can handle by simple side casting?

  1. Its bucket colour
  2. Its dump radius and dump height
  3. Its engine brand
  4. Its tyre size
Show answer & solution

Answer: (B) Its dump radius and dump height

Longer booms give a larger reach and dump height.

Question 32

What is the key cut in dragline strip mining?

  1. A drainage ditch
  2. The coal cut
  3. A narrow initial cut along the highwall toe that forms the new highwall
  4. The final cut at the end of a strip
Show answer & solution

Answer: (C) A narrow initial cut along the highwall toe that forms the new highwall

The key cut sets a stable highwall for the rest of the strip.

Question 33

What is cast blasting in strip mines?

  1. Blasting the topsoil
  2. Blasting that throws a large part of the overburden directly into the mined-out pit
  3. Blasting only the coal
  4. Blasting with no explosives
Show answer & solution

Answer: (B) Blasting that throws a large part of the overburden directly into the mined-out pit

High-energy blasts move 20–40% of overburden into its final position.

Question 34

What is the main benefit of cast blasting?

  1. It increases coal grade
  2. It removes the need for drilling
  3. It eliminates all vibration
  4. It reduces the overburden that must be moved by draglines or trucks
Show answer & solution

Answer: (D) It reduces the overburden that must be moved by draglines or trucks

Material cast by explosives does not need to be handled by equipment.

Question 35

Which surface mining system mines overburden in benches with shovels and trucks hauling it to dumps, as used at Thar Block-II?

  1. Truck-and-shovel open cast mining
  2. Dragline strip mining
  3. Dredging
  4. Highwall mining
Show answer & solution

Answer: (A) Truck-and-shovel open cast mining

Truck-and-shovel systems are flexible for thick and variable overburden.

Question 36

What is the effect of a lower stripping cost per tonne on the break-even stripping ratio?

  1. It makes the ratio zero
  2. It increases the break-even stripping ratio
  3. It has no effect
  4. It decreases the break-even stripping ratio
Show answer & solution

Answer: (B) It increases the break-even stripping ratio

Cheaper waste removal allows more waste to be moved per tonne of ore.

Question 37

Which ratio compares the cost of removing one tonne of waste with the profit from one tonne of ore at the pit edge?

  1. Swell factor
  2. Overall stripping ratio
  3. Load factor
  4. Incremental (marginal) stripping ratio
Show answer & solution

Answer: (D) Incremental (marginal) stripping ratio

Pit limits are set where the incremental ratio reaches the break-even value.