What is the vertical distance between two successive benches in an open pit called?
Show answer & solution
Answer: (D) Bench height
Bench height is the vertical distance from the toe to the crest of a bench.
Mining Engineering · Surface Mining
37 questions, each with the answer and a worked solution.
Practice interactively and track your score →What is the vertical distance between two successive benches in an open pit called?
Answer: (D) Bench height
Bench height is the vertical distance from the toe to the crest of a bench.
On what is the bench height of an open pit mainly based?
Answer: (B) Digging reach of the loading equipment and rock conditions
Bench height usually matches the safe digging height of the shovel or excavator.
What is the horizontal surface on which drilling, blasting and loading take place in an open pit called?
Answer: (C) Working bench (bench floor)
Working benches are kept wide enough for drills, loaders and trucks.
What is the top edge of a bench face called?
Answer: (A) Crest
The crest is the top edge and the toe is the bottom edge of the bench face.
What is the bottom edge of a bench face called?
Answer: (C) Toe
Poor blasting can leave a hard toe that is difficult to dig.
What is the final boundary of an open pit at the end of its life called?
Answer: (B) Ultimate pit limit
The ultimate pit limit encloses all material that is economic to mine.
Which classical algorithm finds the ultimate pit limit that maximises total undiscounted value using graph theory?
Answer: (A) Lerchs–Grossmann algorithm
Lerchs and Grossmann (1965) gave a rigorous graph-theory method for pit optimisation.
Which simple heuristic method moves an inverted cone through the block model to define pit limits?
Answer: (D) Floating (moving) cone method
Each positive block is tested by mining the cone of blocks above it.
What is the main drawback of the floating cone method?
Answer: (B) It may miss the true optimum pit because cones are tested one at a time
Combinations of overlapping cones can be missed, so the result may not be optimal.
What is a block model in open pit planning?
Answer: (A) A three-dimensional grid of blocks, each with estimated grade, density and value
Pit optimisation and scheduling are carried out on the block model.
What is a pushback (cutback) in open pit mining?
Answer: (C) An intermediate expansion phase of the pit towards the final limit
Large pits are mined in a series of nested pushbacks.
What is the small initial pit mined to expose ore early called?
Answer: (D) Starter pit
A starter pit targets high-value ore with low stripping to improve early cash flow.
What is cut-off grade?
Answer: (B) Minimum grade at which material is processed as ore rather than sent to waste
Material above cut-off goes to the plant; material below goes to waste or stockpile.
Which concept is the basis of Lane's theory for optimising cut-off grade over mine life?
Answer: (D) Opportunity cost of time, maximising net present value
Lane balanced mining, processing and market capacities to maximise NPV.
What is the inclined road that allows trucks to travel from the pit floor to the surface called?
Answer: (C) Haul ramp
Ramps are built into the pit walls at a safe gradient.
Which ramp layout is commonly used in roughly circular deep pits?
Answer: (A) Spiral ramp
A spiral ramp winds around the pit walls.
Which ramp layout is used where the ramp is confined to one wall of the pit?
Answer: (D) Switchback (zig-zag) ramp
Switchbacks reverse direction on the same wall but need tight, slow turns.
What is the low point dug at the pit bottom to collect water for pumping called?
Answer: (A) Sump
Pit dewatering pumps draw water from the sump.
What is ore dilution in open pit mining?
Answer: (C) Mixing of waste with ore during mining, which lowers the mined grade
Dilution adds tonnes but lowers grade; it is controlled by careful digging at ore boundaries.
What is ore loss in mining?
Answer: (B) Ore left behind or sent to waste
Ore loss reduces recovered metal.
What is the selective mining unit (SMU)?
Answer: (A) The smallest block that can be mined separately as ore or waste
SMU size depends on equipment size and grade control practice.
Which geostatistical method is most widely used to estimate block grades?
Answer: (B) Kriging
Kriging gives the best linear unbiased estimate using the variogram.
What is the variogram used for in ore reserve estimation?
Answer: (C) To describe the spatial continuity of grade
The variogram shows how grade differences increase with distance.
What is the main advantage of open pit mining over underground mining?
Answer: (D) Higher productivity and lower cost per tonne with high recovery
Large equipment and safe working conditions give low unit costs.
When is it usually economic to change from open pit to underground mining?
Answer: (C) When the cost of further stripping exceeds the cost of mining the remaining ore underground
The transition depth is found by comparing open pit and underground costs.
Which surface method mines flat-lying shallow coal seams in long parallel cuts, casting overburden into the previous cut?
Answer: (B) Strip mining
Strip mining places spoil in the mined-out strip next to the active cut.
Which machine is typically used for overburden casting in large strip coal mines?
Answer: (D) Dragline
Walking draglines dig and side-cast overburden into the previous strip.
Which surface mining method is used in hilly terrain where coal seams outcrop along the contours?
Answer: (A) Contour mining
Mining follows the outcrop around the hillside.
Which method extracts coal from an exposed highwall with a remotely controlled machine driven into the seam?
Answer: (A) Highwall (auger) mining
Highwall mining recovers coal beyond the economic stripping limit.
Which surface method recovers heavy minerals and gold from loose alluvial deposits using water?
Answer: (B) Placer mining
Placer methods include panning, sluicing, hydraulicking and dredging.
Which surface method uses high-pressure water jets to break and wash loose deposits?
Answer: (C) Hydraulicking
Monitors direct water jets at gravel banks.
What is a glory hole in surface mining?
Answer: (D) A funnel-shaped pit from which ore falls down a raise to underground haulage
Glory hole mining combines surface breaking with underground transport.
Which open pit copper–gold mine in Chagai, Balochistan, has been operated by MCC since the early 2000s?
Answer: (A) Saindak
The Saindak Copper-Gold Project is run by MCC Resources Development Company.
Which large copper–gold porphyry project in Chagai, Balochistan, is being developed by Barrick as an open pit mine?
Answer: (C) Reko Diq
Reko Diq is one of the world's largest undeveloped copper–gold deposits.
Which open pit lignite mine in Sindh is operated by Sindh Engro Coal Mining Company?
Answer: (D) Thar Block-II
Thar Block-II supplies lignite to mine-mouth power plants.
What is production scheduling in open pit planning?
Answer: (B) Deciding which blocks are mined in each period
Schedules aim to maximise NPV within mining and plant capacities.
What is the effect of a higher metal price on the ultimate pit limit?
Answer: (A) The pit becomes larger and deeper
A higher price makes more marginal material economic.