What is the main purpose of load flow analysis in a power network?
Show answer & solution
Answer: (D) To calculate steady-state operating conditions such as voltages, angles and power flows
Load flow studies are used for planning and operation.
Electrical Engineering · Power Systems
34 questions, each with the answer and a worked solution.
Practice interactively and track your score →What is the main purpose of load flow analysis in a power network?
Answer: (D) To calculate steady-state operating conditions such as voltages, angles and power flows
Load flow studies are used for planning and operation.
Which matrix relates bus current injections to bus voltages in a power network?
Answer: (B) Bus admittance matrix (Ybus)
I = YbusV.
Which quantities are specified at the slack (swing) bus in load flow studies?
Answer: (A) Voltage magnitude and angle
The slack bus supplies the system losses.
Which quantities are specified at a PV (generator) bus?
Answer: (D) Real power and voltage magnitude
Reactive power and angle are calculated.
Which quantities are specified at a PQ (load) bus?
Answer: (C) Real and reactive power
Most buses in a network are PQ buses.
What is the main role of the slack bus in load flow analysis?
Answer: (B) To balance generation and load by supplying system losses
Losses are not known until the solution is found.
Why is the Ybus matrix of a large power system described as sparse?
Answer: (D) Most buses are connected to only a few other buses, so most elements are zero
Sparsity techniques make large studies efficient.
How is the diagonal element Yii of the bus admittance matrix formed?
Answer: (A) By adding all admittances connected to bus i
Off-diagonal elements are the negative of the admittance between buses.
What is the main disadvantage of the Gauss–Seidel load flow method?
Answer: (C) Slow convergence for large systems
It is simple and needs little memory.
What is the main advantage of the Newton–Raphson load flow method?
Answer: (B) Fast (quadratic) convergence in few iterations
Each iteration needs the Jacobian matrix.
What is the basis of the fast decoupled load flow method?
Answer: (C) Real power is mainly linked to voltage angles and reactive power to voltage magnitudes
Decoupling speeds up solution of large transmission networks.
How is per-unit impedance defined?
Answer: (A) Actual impedance divided by base impedance
Per-unit values simplify calculations across voltage levels.
How is base impedance calculated from base voltage and base MVA?
Answer: (D) Zbase = (kV base)²/MVA base
It is in ohms.
What is the base impedance for an 11 kV, 100 MVA base?
Answer: (B) 1.21 Ω
Zbase = 11²/100 = 1.21 Ω.
How is a per-unit impedance converted from an old base to a new base?
Answer: (A) Znew = Zold × (MVAnew/MVAold) × (kVold/kVnew)²
Equipment impedances are given on their own ratings.
What is a key advantage of the per-unit system?
Answer: (C) A transformer's per-unit impedance is the same on both sides
Per-unit values of similar equipment fall in narrow ranges.
What is the condition for economic dispatch of generators neglecting losses?
Answer: (D) All generators operate at equal incremental fuel cost
Equal incremental cost minimises total generation cost.
What is a penalty factor in economic dispatch?
Answer: (B) A factor that adjusts incremental cost of a plant for its effect on transmission losses
Plants far from loads are penalised for higher losses.
What is unit commitment?
Answer: (A) Deciding which generating units should be on or off over a period to meet demand at minimum cost
It considers start-up costs, minimum run times and reserves.
In contingency analysis, what does the N−1 security criterion require?
Answer: (B) The system must survive the outage of any one major element without violating limits
N−1 is a basic planning and operating criterion.
Which quantity is mainly controlled by the flow of reactive power in a transmission network?
Answer: (C) Bus voltage magnitude
Reactive power shortage causes low voltages.
Which quantity mainly determines real power flow between two buses?
Answer: (D) The difference in voltage phase angles
P ≈ (V1V2/X) sin δ.
What is DC load flow?
Answer: (D) A simplified linear load flow that assumes flat voltages and small angle differences
It is fast and used for contingency screening.
What is the Zbus matrix mainly used for?
Answer: (A) Fault calculations, since its elements give driving-point and transfer impedances
Zbus is the inverse of Ybus.
What is optimal power flow (OPF)?
Answer: (C) A load flow that optimises an objective such as cost while meeting network limits
OPF adjusts generation and controls within constraints.
Which method is commonly used for short-term load forecasting?
Answer: (B) Statistical and artificial intelligence models using past load and weather data
Accurate forecasts help unit commitment and dispatch.
What is the typical per-unit impedance range of large power transformers?
Answer: (B) About 0.05 to 0.15 pu
Typical impedances fall within narrow ranges in per unit.
Which loss formula expresses transmission losses in terms of generator outputs?
Answer: (C) Kron's B-coefficient loss formula
PL = ΣΣ Pi Bij Pj.
What happens to a PV bus in load flow if its reactive power limit is exceeded?
Answer: (A) It is converted to a PQ bus with Q fixed at the limit
The voltage then can no longer be held at the set value.
What is the per-unit value of a 500 kV voltage on a 500 kV base?
Answer: (C) 1.0 pu
Per unit = actual/base.
What is the per-unit reactance of a 0.1 pu transformer on its own 50 MVA rating when converted to a 100 MVA base at the same voltage?
Answer: (C) 0.2 pu
Znew = 0.1 × (100/50) = 0.2 pu.
What does the Jacobian matrix contain in Newton–Raphson load flow?
Answer: (B) Partial derivatives of power equations with respect to voltage angles and magnitudes
It is recalculated in each iteration.
What is a flat start in load flow studies?
Answer: (D) Starting iterations with all bus voltages at 1.0 pu and zero angle
It is the usual initial guess.
What does a load flow study show when a line is overloaded?
Answer: (A) Power flow exceeding the line's thermal rating
Planners then add lines or reroute power.