Mine Economics & Mineral Processing: Mine Closure and Environment

Mining Engineering · Mine Economics & Mineral Processing

30 questions, each with the answer and a worked solution.

Practice interactively and track your score →
Question 1

When should a mine closure plan be prepared?

  1. Only after mining ends
  2. At the planning stage, before mining starts, and updated during operations
  3. Only when the mine sells its equipment
  4. Never
Show answer & solution

Answer: (B) At the planning stage, before mining starts, and updated during operations

Planning closure early reduces costs and environmental damage.

Question 2

What is progressive rehabilitation?

  1. Restoring disturbed land in stages while mining continues
  2. Abandoning the site
  3. Increasing disturbance
  4. Rehabilitating only after closure
Show answer & solution

Answer: (A) Restoring disturbed land in stages while mining continues

It spreads costs and shows good practice.

Question 3

Which Pakistani federal law introduced the requirement for environmental assessment of projects?

  1. Pakistan Environmental Protection Act, 1997
  2. Factories Act, 1934
  3. Explosives Act, 1884
  4. Mines Act, 1923
Show answer & solution

Answer: (A) Pakistan Environmental Protection Act, 1997

After the 18th Amendment, provinces have passed their own environmental protection Acts.

Question 4

What is the difference between an IEE and an EIA?

  1. An EIA is shorter
  2. An IEE is a preliminary assessment for smaller projects; an EIA is a detailed assessment for larger ones
  3. There is no difference
  4. An IEE is needed only after closure
Show answer & solution

Answer: (B) An IEE is a preliminary assessment for smaller projects; an EIA is a detailed assessment for larger ones

Mining projects usually need a full EIA.

Question 5

What are the National Environmental Quality Standards (NEQS) in Pakistan?

  1. Standards for wages
  2. Standards for ore grade
  3. Limits for emissions and effluents from industry and projects
  4. Standards for explosives
Show answer & solution

Answer: (C) Limits for emissions and effluents from industry and projects

Mines must meet NEQS for liquid effluents and air emissions.

Question 6

What is financial assurance (closure bond) in mining?

  1. A loan to buy trucks
  2. A bonus for workers
  3. A royalty
  4. Funds or guarantees provided to cover closure and rehabilitation costs
Show answer & solution

Answer: (D) Funds or guarantees provided to cover closure and rehabilitation costs

It protects the public if the company cannot pay for closure.

Question 7

What is the aim of post-mining land use planning?

  1. To build new pits
  2. To return land to a safe, stable and useful condition agreed with stakeholders
  3. To increase pollution
  4. To leave land as it is
Show answer & solution

Answer: (B) To return land to a safe, stable and useful condition agreed with stakeholders

Options include farming, forestry, water bodies or industry.

Question 8

What is passive treatment of acid mine drainage?

  1. Using natural processes such as constructed wetlands and limestone drains
  2. Pumping water into rivers
  3. Adding lime with machines daily
  4. Discharging untreated water
Show answer & solution

Answer: (A) Using natural processes such as constructed wetlands and limestone drains

Passive systems need little ongoing maintenance.

Question 9

Why is biodiversity protection considered in mining projects?

  1. To increase ore grade
  2. It is not affected by mining
  3. Mining can destroy habitats and threaten species
  4. To reduce costs
Show answer & solution

Answer: (C) Mining can destroy habitats and threaten species

Offsets and rehabilitation help reduce biodiversity loss.

Question 10

What is a "social licence to operate"?

  1. A blasting licence
  2. A driving licence
  3. A government mining lease
  4. Ongoing acceptance of a mining project by local communities and stakeholders
Show answer & solution

Answer: (D) Ongoing acceptance of a mining project by local communities and stakeholders

Loss of community support can stop projects.

Question 11

What is the purpose of community development programmes by mining companies?

  1. To share benefits such as jobs, health and education with local people
  2. To increase royalties only
  3. To avoid environmental laws
  4. To reduce production
Show answer & solution

Answer: (A) To share benefits such as jobs, health and education with local people

Benefit-sharing is a key issue in projects such as Reko Diq.

Question 12

What is ISO 14001?

  1. A ventilation standard
  2. An international standard for environmental management systems
  3. A standard for explosives
  4. A coal quality standard
Show answer & solution

Answer: (B) An international standard for environmental management systems

It helps organisations manage environmental impacts systematically.

Question 13

What does the International Cyanide Management Code promote?

  1. Use of mercury
  2. Banning gold mining
  3. Safe manufacture, transport, use and disposal of cyanide in gold mining
  4. Use of more cyanide
Show answer & solution

Answer: (C) Safe manufacture, transport, use and disposal of cyanide in gold mining

Signatory mines are independently audited.

Question 14

What is the main long-term risk of poorly closed tailings facilities?

  1. Improved soil fertility
  2. No risk
  3. Lower water levels
  4. Dam failure and release of contaminated tailings
Show answer & solution

Answer: (D) Dam failure and release of contaminated tailings

Tailings must remain stable for very long periods.

Question 15

What does "care and maintenance" mean for a mine?

  1. Normal operation
  2. Temporary suspension of production while the site is kept safe and maintained
  3. Expansion of the mine
  4. Permanent closure with no monitoring
Show answer & solution

Answer: (B) Temporary suspension of production while the site is kept safe and maintained

Mines may enter care and maintenance when prices are low.

Question 16

Why is environmental monitoring continued after mine closure?

  1. To confirm that water, landforms and vegetation are stable and safe
  2. To start production
  3. To measure wages
  4. To check explosives
Show answer & solution

Answer: (A) To confirm that water, landforms and vegetation are stable and safe

Monitoring shows when the site can be relinquished.

Question 17

What is relinquishment of a mine site?

  1. Restarting production
  2. Abandoning the site without approval
  3. Selling the mine to a new owner
  4. The formal return of a rehabilitated site to the government or landowner after closure criteria are met
Show answer & solution

Answer: (D) The formal return of a rehabilitated site to the government or landowner after closure criteria are met

Authorities must agree that closure objectives have been achieved.

Question 18

What is the main purpose of stakeholder consultation in mining projects?

  1. To sell shares
  2. To advertise products
  3. To inform and involve affected people and consider their concerns in decisions
  4. To reduce safety
Show answer & solution

Answer: (C) To inform and involve affected people and consider their concerns in decisions

Consultation is required in EIA processes.

Question 19

What is sustainable development in mining?

  1. Meeting present needs from mineral resources without compromising future generations
  2. Leaving all minerals unmined
  3. Mining as fast as possible
  4. Ignoring the environment
Show answer & solution

Answer: (A) Meeting present needs from mineral resources without compromising future generations

It balances economic, social and environmental goals.

Question 20

Why is water management important in mine closure?

  1. It only affects ventilation
  2. Water has no role after closure
  3. Pits, dumps and tailings can affect surface and groundwater quality for many years
  4. It only matters during blasting
Show answer & solution

Answer: (C) Pits, dumps and tailings can affect surface and groundwater quality for many years

Pit lakes and seepage may need long-term management.

Question 21

What is a pit lake?

  1. A tailings dam
  2. A lake that forms when a closed open pit fills with water
  3. A water tank
  4. A sump in an underground mine
Show answer & solution

Answer: (B) A lake that forms when a closed open pit fills with water

Pit lake water quality must be predicted and managed.

Question 22

Which international agreement aims to reduce mercury use in artisanal and small-scale gold mining?

  1. Kyoto Protocol
  2. Basel Convention only
  3. Paris Agreement only
  4. Minamata Convention
Show answer & solution

Answer: (D) Minamata Convention

Pakistan is a party to the Minamata Convention.

Question 23

What is a contaminated land assessment at mine closure?

  1. A geological map
  2. A ventilation survey
  3. A blasting report
  4. Investigation of soils and water for pollutants left by mining and processing
Show answer & solution

Answer: (D) Investigation of soils and water for pollutants left by mining and processing

Contaminated areas must be remediated before relinquishment.

Question 24

What is the main purpose of revegetation in mine rehabilitation?

  1. To hide the mine from view only
  2. To stabilise the land against erosion and restore ecosystems
  3. To store water
  4. To increase dust
Show answer & solution

Answer: (B) To stabilise the land against erosion and restore ecosystems

Native species are usually preferred.

Question 25

Why should waste dumps be reshaped to gentle slopes at closure?

  1. To make them stable, reduce erosion and allow revegetation
  2. To store explosives
  3. To make them steeper
  4. To increase dust
Show answer & solution

Answer: (A) To make them stable, reduce erosion and allow revegetation

Final slopes are usually much flatter than the angle of repose.

Question 26

Which environmental impact is most typical of artisanal coal mining in Balochistan and KP?

  1. Radiation from uranium
  2. Ocean pollution
  3. Unplanned surface disturbance, waste piles and coal dust with little rehabilitation
  4. No impact
Show answer & solution

Answer: (C) Unplanned surface disturbance, waste piles and coal dust with little rehabilitation

Small mines often lack closure and rehabilitation planning.

Question 27

What is the purpose of baseline environmental studies before mining starts?

  1. To hire workers
  2. To record existing environmental conditions for later comparison
  3. To design blasts
  4. To calculate royalties
Show answer & solution

Answer: (B) To record existing environmental conditions for later comparison

Without baselines, impacts cannot be measured.

Question 28

Why are surface openings such as old shafts and adits sealed at closure?

  1. To increase ventilation
  2. To keep mining
  3. To prevent people and animals falling in and stop unauthorised entry
  4. To store water
Show answer & solution

Answer: (C) To prevent people and animals falling in and stop unauthorised entry

Safe sealing is a basic closure requirement.

Question 29

What is mine closure cost estimated for during planning?

  1. Only exploration
  2. Only the cost of new trucks
  3. Only wages during production
  4. Demolition, rehabilitation, water treatment, monitoring and social transition costs
Show answer & solution

Answer: (D) Demolition, rehabilitation, water treatment, monitoring and social transition costs

Closure costs are included in project economics.

Question 30

What is meant by environmental management plan (EMP) in a mining project?

  1. A plan describing measures to avoid, reduce and monitor environmental impacts
  2. A ventilation plan only
  3. A blasting plan
  4. A plan of the mine roads
Show answer & solution

Answer: (A) A plan describing measures to avoid, reduce and monitor environmental impacts

The EMP forms part of the approved EIA.

Practice these 30 questions interactively →