What are variable operating costs?
Show answer & solution
Answer: (D) Costs that change in proportion to production, such as raw materials and utilities
Raw materials are usually the largest variable cost.
Chemical Engineering · Plant Economics & Safety
41 questions, each with the answer and a worked solution.
Practice interactively and track your score →What are variable operating costs?
Answer: (D) Costs that change in proportion to production, such as raw materials and utilities
Raw materials are usually the largest variable cost.
What are fixed operating costs?
Answer: (B) Costs that do not change with production rate, such as depreciation, insurance, rent and much labour
They continue even at low output.
What is the break-even point?
Answer: (D) The production rate at which total revenue equals total cost
Above it the plant makes a profit.
What is the break-even output if fixed costs are Rs 1 million per year, selling price is Rs 50 per unit and variable cost is Rs 30 per unit?
Answer: (C) 50,000 units
Break-even = fixed cost/(price − variable cost).
What is the contribution margin per unit?
Answer: (A) Selling price minus variable cost per unit
It covers fixed costs and profit.
What is the shutdown point of a plant?
Answer: (B) The output level at which revenue just covers variable costs, below which it is better to stop operating
Fixed costs are incurred even when shut down.
What are general expenses in plant operating costs?
Answer: (C) Administrative, distribution, selling, research and finance costs
They are part of total product cost.
What is the typical largest component of total product cost in commodity chemical plants?
Answer: (A) Raw materials
For fertiliser plants, natural gas dominates.
What does the optimum economic insulation thickness balance?
Answer: (B) Cost of insulation against cost of heat lost
Total annual cost is minimised.
What does the optimum pipe diameter balance?
Answer: (D) Pipe capital cost against pumping energy cost
Larger pipes cost more but reduce pressure drop.
What does the optimum reflux ratio in distillation balance?
Answer: (C) Column capital cost against reboiler and condenser energy costs
It is usually 1.1–1.5 times minimum reflux.
What does the optimum number of effects in an evaporator balance?
Answer: (D) Equipment cost against steam savings
More effects save steam but cost more.
What is the optimum batch cycle time in batch processes?
Answer: (A) The cycle time that maximises production or profit per unit time, including downtime
Reaction slows as conversion increases.
What does linear programming optimise in refineries?
Answer: (B) Crude selection and product blending to maximise profit within constraints
It is widely used in refinery planning.
What is the typical maintenance cost per year as a fraction of fixed capital in chemical plants?
Answer: (B) About 2–10%
Corrosive services have higher maintenance cost.
What is plant capacity utilisation?
Answer: (C) Actual production as a percentage of rated capacity
Low utilisation raises fixed cost per unit.
What happens to fixed cost per unit of product when production increases?
Answer: (D) It decreases
Fixed costs are spread over more units.
What is the main economic benefit of energy conservation in process plants?
Answer: (A) Lower utility costs and improved profitability
Pinch analysis and heat recovery are common measures.
What is the gross profit of a plant?
Answer: (D) Revenue minus total product cost before tax
Net profit = gross profit − income tax.
What is net profit after tax if gross profit is Rs 10 million and tax rate is 30%?
Answer: (B) Rs 7 million
10 × (1 − 0.30).
What does a cost–benefit analysis compare?
Answer: (A) The total expected costs of a project with its expected benefits
It supports public sector project decisions.
What is economic order quantity (EOQ) used for?
Answer: (C) Finding the order size that minimises total inventory ordering and holding costs
EOQ = √(2DS/H).
What is the main reason for keeping spare parts inventory?
Answer: (B) Reducing downtime when equipment fails
Critical spares are kept for key equipment.
What is the effect of operating a plant below design capacity on unit production cost?
Answer: (A) It increases unit cost because fixed costs are spread over fewer units
Many Pakistani plants faced this during gas shortages.
What is the margin of safety in break-even analysis?
Answer: (D) The amount by which actual sales exceed break-even sales
It shows how far sales can fall before losses.
What is the profit at 80,000 units if fixed costs are Rs 1 million, price Rs 50 and variable cost Rs 30 per unit?
Answer: (C) Rs 600,000
80,000 × 20 − 1,000,000.
What is the main purpose of process optimisation?
Answer: (B) Finding operating conditions or designs that maximise profit or minimise cost within constraints
Objective functions and constraints define the problem.
What is an objective function in optimisation?
Answer: (C) The quantity to be maximised or minimised, such as profit or cost
Decision variables are adjusted to optimise it.
What does the term constraint mean in process optimisation?
Answer: (B) A limit such as equipment capacity, safety limit or product specification
Constraints define the feasible region.
What is the optimum cooling water outlet temperature in a heat exchanger design based on?
Answer: (A) Balancing water pumping and cooling cost against exchanger area
Higher outlet temperature saves water but needs more area.
What are utility costs in chemical plants?
Answer: (D) Costs of steam, electricity, cooling water, fuel, compressed air and nitrogen
They are variable costs.
What is the main cost driver for urea plants in Pakistan?
Answer: (B) The price and availability of natural gas feedstock and fuel
Gas is the main feedstock.
What is the main purpose of a cost centre in plant accounting?
Answer: (A) Tracking costs for a department or unit to control expenses
It supports budgeting.
What is the incremental return on investment used for?
Answer: (D) Comparing whether the extra investment in a more expensive alternative is justified by extra savings
The increment must earn at least the minimum acceptable return.
What is the annual saving if insulation reduces heat loss by 100 kW and steam costs Rs 3 per kWh, for 8,000 hours a year?
Answer: (C) Rs 2.4 million
100 × 3 × 8,000.
What is simple payback for an energy saving project costing Rs 6 million that saves Rs 2 million per year?
Answer: (B) 3 years
6/2.
What does on-stream factor (availability) mean?
Answer: (C) The fraction of the year the plant is actually operating
Plants typically operate about 8,000 hours per year (about 91%).
What is the typical number of operating hours assumed per year for a continuous chemical plant?
Answer: (C) About 8,000 hours
Time is allowed for maintenance shutdowns.
What is a learning curve effect in operating costs?
Answer: (D) Unit costs falling as operating experience accumulates
It applies to new technologies and plants.
What is the purpose of a budget in plant operations?
Answer: (A) Planning and controlling expected revenue and expenses over a period
Variance analysis compares actual with budget.
What is the cost of 1 tonne of steam if it needs 2.8 GJ of fuel at Rs 1,500 per GJ, ignoring other costs?
Answer: (D) Rs 4,200
2.8 × 1,500.