Cost & Management Accounting: Costing Methods & Activity-Based Costing

Finance · Cost & Management Accounting

35 questions, each with the answer and a worked solution.

Practice interactively and track your score →
Question 1

Which costing method is used when work is done to customer specifications as separate jobs?

  1. Service costing
  2. Process costing
  3. Operating costing
  4. Job costing
Show answer & solution

Answer: (D) Job costing

Printing presses and repair workshops use job costing.

Question 2

Which costing method is used for continuous production of identical units through a series of processes?

  1. Contract costing
  2. Process costing
  3. Batch costing
  4. Job costing
Show answer & solution

Answer: (B) Process costing

Cement, sugar and textile industries use process costing.

Question 3

Which costing method is used when a number of identical units are produced together as a lot?

  1. Batch costing
  2. Process costing
  3. Job costing
  4. Contract costing
Show answer & solution

Answer: (A) Batch costing

Pharmaceutical and biscuit manufacturers use batch costing.

Question 4

Which costing method is used by builders for large, long-term construction projects?

  1. Contract costing
  2. Batch costing
  3. Operating costing
  4. Process costing
Show answer & solution

Answer: (A) Contract costing

Each contract is treated as a cost unit.

Question 5

Which costing method is used by transport companies, hospitals and power stations?

  1. Service (operating) costing
  2. Job costing
  3. Contract costing
  4. Process costing
Show answer & solution

Answer: (A) Service (operating) costing

It uses composite cost units such as passenger-km.

Question 6

What is the document recording all costs charged to a particular job called?

  1. Process account
  2. Bin card
  3. Clock card
  4. Job cost sheet
Show answer & solution

Answer: (D) Job cost sheet

It accumulates materials, labour and overheads for the job.

Question 7

In contract costing, what is the value of work completed and certified by the architect called?

  1. Work certified
  2. Retention money
  3. Notional profit
  4. Work uncertified
Show answer & solution

Answer: (A) Work certified

Contractors receive payments based on work certified.

Question 8

What is the part of the certified value withheld by the contractee until satisfactory completion called?

  1. Escalation
  2. Progress payment
  3. Work uncertified
  4. Retention money
Show answer & solution

Answer: (D) Retention money

It protects the client against defects.

Question 9

What is the difference between the value of work certified and the cost of work certified called?

  1. Notional profit
  2. Retention
  3. Final profit
  4. Escalation
Show answer & solution

Answer: (A) Notional profit

Only part of notional profit is taken to profit on incomplete contracts.

Question 10

What is the clause in a contract allowing the contract price to rise with increases in material and labour prices called?

  1. Penalty clause
  2. Escalation clause
  3. De-escalation clause
  4. Retention clause
Show answer & solution

Answer: (B) Escalation clause

It protects the contractor from inflation.

Question 11

What is the expected loss in a process that is unavoidable under normal conditions called?

  1. Abnormal gain
  2. Abnormal loss
  3. Spoilage only
  4. Normal loss
Show answer & solution

Answer: (D) Normal loss

Its cost is absorbed by good units.

Question 12

What is the loss in a process exceeding the normal loss called?

  1. Normal loss
  2. Abnormal gain
  3. Scrap
  4. Abnormal loss
Show answer & solution

Answer: (D) Abnormal loss

It is valued like good units and written off to costing profit and loss.

Question 13

What arises when actual loss in a process is less than the normal loss?

  1. Spoilage
  2. Normal loss
  3. Abnormal loss
  4. Abnormal gain
Show answer & solution

Answer: (D) Abnormal gain

It is credited to the costing profit and loss account.

Question 14

What is the concept of converting partly completed units into an equivalent number of fully completed units called?

  1. Normal units
  2. Equivalent units (equivalent production)
  3. Joint units
  4. Standard units
Show answer & solution

Answer: (B) Equivalent units (equivalent production)

It is used to value work in progress in process costing.

Question 15

Closing work in progress is 1,000 units, 60% complete as to conversion costs. How many equivalent units of conversion does it represent?

  1. 1,600
  2. 600
  3. 400
  4. 1,000
Show answer & solution

Answer: (B) 600

1,000 × 60% = 600.

Question 16

What are two or more products produced simultaneously from the same raw material, each with significant value, called?

  1. Scrap
  2. Waste
  3. Joint products
  4. By-products
Show answer & solution

Answer: (C) Joint products

Petrol, diesel and kerosene from crude oil are joint products.

Question 17

What is a secondary product of small value produced incidentally with the main product called?

  1. Joint product
  2. Scrap only
  3. Main product
  4. By-product
Show answer & solution

Answer: (D) By-product

Molasses is a by-product of sugar manufacturing.

Question 18

What is the point in a process where joint products become separately identifiable called?

  1. Re-order point
  2. Split-off point
  3. Shutdown point
  4. Break-even point
Show answer & solution

Answer: (B) Split-off point

Costs incurred before this point are joint costs.

Question 19

Which methods are commonly used to apportion joint costs among joint products?

  1. FIFO and LIFO
  2. High–low and least squares
  3. Physical units and sales value methods
  4. Halsey and Rowan
Show answer & solution

Answer: (C) Physical units and sales value methods

Net realizable value method is also used.

Question 20

What is the residue of materials that has a small sale value, such as metal shavings, called?

  1. Abnormal gain
  2. Joint product
  3. Scrap
  4. By-product
Show answer & solution

Answer: (C) Scrap

Its sale value usually reduces the cost of the process.

Question 21

Which costing system assigns overheads to products based on the activities that cause costs?

  1. Absorption costing with single rate
  2. Activity-based costing (ABC)
  3. Marginal costing
  4. Standard costing
Show answer & solution

Answer: (B) Activity-based costing (ABC)

It was developed by Robin Cooper and Robert Kaplan.

Question 22

What is a factor that causes the cost of an activity to change called in ABC?

  1. Cost unit
  2. Cost driver
  3. Cost sheet
  4. Cost centre
Show answer & solution

Answer: (B) Cost driver

Number of set-ups and number of orders are examples.

Question 23

Which is a suitable cost driver for machine set-up costs?

  1. Number of employees
  2. Sales value
  3. Number of set-ups
  4. Floor area
Show answer & solution

Answer: (C) Number of set-ups

Set-up costs depend on how often machines are set up.

Question 24

Why is activity-based costing more accurate than traditional absorption costing for diverse products?

  1. It charges only direct costs
  2. It recognizes that many overheads are driven by activities other than volume
  3. It uses one plant-wide rate
  4. It ignores overheads
Show answer & solution

Answer: (B) It recognizes that many overheads are driven by activities other than volume

Low-volume complex products are usually under-costed by traditional systems.

Question 25

What is a group of overhead costs related to a particular activity called in ABC?

  1. Profit centre
  2. Cost centre only
  3. Cost pool
  4. Cost unit
Show answer & solution

Answer: (C) Cost pool

Each pool has its own cost driver rate.

Question 26

What is the costing technique that sets the cost of a product by deducting the desired profit from the market price?

  1. Standard costing
  2. Life cycle costing
  3. Marginal costing
  4. Target costing
Show answer & solution

Answer: (D) Target costing

It originated in Japan.

Question 27

What is the approach that tracks all costs of a product from design to disposal called?

  1. Kaizen costing
  2. Target costing
  3. Life cycle costing
  4. Batch costing
Show answer & solution

Answer: (C) Life cycle costing

Most costs are committed at the design stage.

Question 28

What is the Japanese approach of making continuous small cost reductions during the production stage called?

  1. Kaizen costing
  2. Target costing
  3. Activity-based costing
  4. Throughput accounting
Show answer & solution

Answer: (A) Kaizen costing

Kaizen means continuous improvement.

Question 29

Which production philosophy aims to produce only what is needed, when it is needed, with minimal inventory?

  1. Mass production with large stocks
  2. Just-in-time (JIT)
  3. Batch production
  4. Process costing
Show answer & solution

Answer: (B) Just-in-time (JIT)

It was developed by Toyota.

Question 30

What is the system that measures the rate at which a business generates money through sales, focusing on bottleneck resources?

  1. Standard costing
  2. Throughput accounting
  3. Marginal costing
  4. Absorption costing
Show answer & solution

Answer: (B) Throughput accounting

It is based on the theory of constraints.

Question 31

What is the main difference between job costing and process costing?

  1. Job costing collects costs by job; process costing collects costs by process and averages them over units
  2. There is no difference
  3. Job costing is used for mass production
  4. Process costing is used for unique orders
Show answer & solution

Answer: (A) Job costing collects costs by job; process costing collects costs by process and averages them over units

Process costing suits continuous, homogeneous production.

Question 32

In process costing, how is the cost of output of one process treated?

  1. It is ignored
  2. It is charged to selling expenses
  3. It is transferred as input cost to the next process
  4. It is written off
Show answer & solution

Answer: (C) It is transferred as input cost to the next process

The final process transfers output to finished goods.

Question 33

In which method of valuing work in progress in process costing are opening work-in-progress costs averaged with current period costs?

  1. Weighted average method
  2. Standard method
  3. FIFO method
  4. LIFO method
Show answer & solution

Answer: (A) Weighted average method

Under FIFO, opening WIP is completed first and costed separately.

Question 34

What is a contract in which the contractor is reimbursed costs plus an agreed profit called?

  1. Cost-plus contract
  2. Fixed price contract
  3. Escalation contract
  4. Turnkey contract
Show answer & solution

Answer: (A) Cost-plus contract

It is used where costs are difficult to estimate.

Question 35

Which is a suitable cost unit for a brick-making business?

  1. Per kilowatt-hour
  2. Per passenger-km
  3. Per thousand bricks
  4. Per patient-day
Show answer & solution

Answer: (C) Per thousand bricks

Cost units should reflect the nature of output.