Which costing method is used when work is done to customer specifications as separate jobs?
Show answer & solution
Answer: (D) Job costing
Printing presses and repair workshops use job costing.
Finance · Cost & Management Accounting
35 questions, each with the answer and a worked solution.
Practice interactively and track your score →Which costing method is used when work is done to customer specifications as separate jobs?
Answer: (D) Job costing
Printing presses and repair workshops use job costing.
Which costing method is used for continuous production of identical units through a series of processes?
Answer: (B) Process costing
Cement, sugar and textile industries use process costing.
Which costing method is used when a number of identical units are produced together as a lot?
Answer: (A) Batch costing
Pharmaceutical and biscuit manufacturers use batch costing.
Which costing method is used by builders for large, long-term construction projects?
Answer: (A) Contract costing
Each contract is treated as a cost unit.
Which costing method is used by transport companies, hospitals and power stations?
Answer: (A) Service (operating) costing
It uses composite cost units such as passenger-km.
What is the document recording all costs charged to a particular job called?
Answer: (D) Job cost sheet
It accumulates materials, labour and overheads for the job.
In contract costing, what is the value of work completed and certified by the architect called?
Answer: (A) Work certified
Contractors receive payments based on work certified.
What is the part of the certified value withheld by the contractee until satisfactory completion called?
Answer: (D) Retention money
It protects the client against defects.
What is the difference between the value of work certified and the cost of work certified called?
Answer: (A) Notional profit
Only part of notional profit is taken to profit on incomplete contracts.
What is the clause in a contract allowing the contract price to rise with increases in material and labour prices called?
Answer: (B) Escalation clause
It protects the contractor from inflation.
What is the expected loss in a process that is unavoidable under normal conditions called?
Answer: (D) Normal loss
Its cost is absorbed by good units.
What is the loss in a process exceeding the normal loss called?
Answer: (D) Abnormal loss
It is valued like good units and written off to costing profit and loss.
What arises when actual loss in a process is less than the normal loss?
Answer: (D) Abnormal gain
It is credited to the costing profit and loss account.
What is the concept of converting partly completed units into an equivalent number of fully completed units called?
Answer: (B) Equivalent units (equivalent production)
It is used to value work in progress in process costing.
Closing work in progress is 1,000 units, 60% complete as to conversion costs. How many equivalent units of conversion does it represent?
Answer: (B) 600
1,000 × 60% = 600.
What are two or more products produced simultaneously from the same raw material, each with significant value, called?
Answer: (C) Joint products
Petrol, diesel and kerosene from crude oil are joint products.
What is a secondary product of small value produced incidentally with the main product called?
Answer: (D) By-product
Molasses is a by-product of sugar manufacturing.
What is the point in a process where joint products become separately identifiable called?
Answer: (B) Split-off point
Costs incurred before this point are joint costs.
Which methods are commonly used to apportion joint costs among joint products?
Answer: (C) Physical units and sales value methods
Net realizable value method is also used.
What is the residue of materials that has a small sale value, such as metal shavings, called?
Answer: (C) Scrap
Its sale value usually reduces the cost of the process.
Which costing system assigns overheads to products based on the activities that cause costs?
Answer: (B) Activity-based costing (ABC)
It was developed by Robin Cooper and Robert Kaplan.
What is a factor that causes the cost of an activity to change called in ABC?
Answer: (B) Cost driver
Number of set-ups and number of orders are examples.
Which is a suitable cost driver for machine set-up costs?
Answer: (C) Number of set-ups
Set-up costs depend on how often machines are set up.
Why is activity-based costing more accurate than traditional absorption costing for diverse products?
Answer: (B) It recognizes that many overheads are driven by activities other than volume
Low-volume complex products are usually under-costed by traditional systems.
What is a group of overhead costs related to a particular activity called in ABC?
Answer: (C) Cost pool
Each pool has its own cost driver rate.
What is the costing technique that sets the cost of a product by deducting the desired profit from the market price?
Answer: (D) Target costing
It originated in Japan.
What is the approach that tracks all costs of a product from design to disposal called?
Answer: (C) Life cycle costing
Most costs are committed at the design stage.
What is the Japanese approach of making continuous small cost reductions during the production stage called?
Answer: (A) Kaizen costing
Kaizen means continuous improvement.
Which production philosophy aims to produce only what is needed, when it is needed, with minimal inventory?
Answer: (B) Just-in-time (JIT)
It was developed by Toyota.
What is the system that measures the rate at which a business generates money through sales, focusing on bottleneck resources?
Answer: (B) Throughput accounting
It is based on the theory of constraints.
What is the main difference between job costing and process costing?
Answer: (A) Job costing collects costs by job; process costing collects costs by process and averages them over units
Process costing suits continuous, homogeneous production.
In process costing, how is the cost of output of one process treated?
Answer: (C) It is transferred as input cost to the next process
The final process transfers output to finished goods.
In which method of valuing work in progress in process costing are opening work-in-progress costs averaged with current period costs?
Answer: (A) Weighted average method
Under FIFO, opening WIP is completed first and costed separately.
What is a contract in which the contractor is reimbursed costs plus an agreed profit called?
Answer: (A) Cost-plus contract
It is used where costs are difficult to estimate.
Which is a suitable cost unit for a brick-making business?
Answer: (C) Per thousand bricks
Cost units should reflect the nature of output.