Cost Accounting: Job, Batch and Process Costing

Accounting · Cost Accounting

40 questions, each with the answer and a worked solution.

Practice interactively and track your score →
Question 1

Where is job costing most suitable?

  1. Where identical units flow continuously
  2. In sugar refining
  3. In cement production
  4. Where work is done to individual customer specifications, such as repairs or printing orders
Show answer & solution

Answer: (D) Where work is done to individual customer specifications, such as repairs or printing orders

Each job is a separate cost unit.

Question 2

Where is batch costing used?

  1. Where one unique job is produced
  2. Where production is continuous
  3. Where a group of identical units is produced together, such as medicines or garments
  4. For services only
Show answer & solution

Answer: (C) Where a group of identical units is produced together, such as medicines or garments

Cost per unit is batch cost ÷ units.

Question 3

Where is contract costing used?

  1. For retail shops
  2. For large, long-duration jobs such as building roads, bridges or dams
  3. For small repair jobs
  4. For mass production
Show answer & solution

Answer: (B) For large, long-duration jobs such as building roads, bridges or dams

Each contract has its own account.

Question 4

Where is process costing used?

  1. In custom repair work
  2. In legal services
  3. In construction contracts
  4. In continuous mass production of similar units, such as cement, sugar or fertilizer
Show answer & solution

Answer: (D) In continuous mass production of similar units, such as cement, sugar or fertilizer

Costs are averaged over output.

Question 5

What is a job cost sheet?

  1. A process account
  2. A bank statement
  3. A record collecting materials, labour and overheads charged to a particular job
  4. A sales invoice
Show answer & solution

Answer: (C) A record collecting materials, labour and overheads charged to a particular job

It shows total job cost.

Question 6

What is the total cost of a job with direct materials Rs 40,000, 200 labour hours at Rs 150 and overheads absorbed at Rs 100 per labour hour?

  1. Rs 70,000
  2. Rs 90,000
  3. Rs 110,000
  4. Rs 80,000
Show answer & solution

Answer: (B) Rs 90,000

40,000 + 30,000 + 20,000.

Question 7

What is the selling price of a job costing Rs 90,000 if profit is 20% of selling price?

  1. Rs 112,500
  2. Rs 108,000
  3. Rs 99,000
  4. Rs 110,000
Show answer & solution

Answer: (A) Rs 112,500

90,000 ÷ 0.80.

Question 8

What are equivalent units in process costing?

  1. Units sold
  2. Units lost
  3. Partly finished units expressed as an equal number of fully finished units
  4. Units started only
Show answer & solution

Answer: (C) Partly finished units expressed as an equal number of fully finished units

They allow costs to be shared fairly.

Question 9

What are the equivalent units for conversion if 8,000 units are completed and 2,000 closing units are 60% complete, with no opening work in process?

  1. 8,000
  2. 8,600
  3. 9,200
  4. 10,000
Show answer & solution

Answer: (C) 9,200

8,000 + 2,000 × 60%.

Question 10

What are the equivalent units for materials if materials are added at the start and 8,000 units are completed with 2,000 units in closing work in process?

  1. 8,000
  2. 9,200
  3. 9,600
  4. 10,000
Show answer & solution

Answer: (D) 10,000

Closing units are 100% complete for materials.

Question 11

What are the FIFO equivalent units for conversion if opening WIP is 2,000 units 40% complete, 9,000 units are completed and closing WIP is 3,000 units 50% complete?

  1. 9,000
  2. 9,700
  3. 10,000
  4. 10,500
Show answer & solution

Answer: (B) 9,700

1,200 + 7,000 + 1,500.

Question 12

What are the weighted average equivalent units for conversion if 9,000 units are completed and closing WIP is 3,000 units 50% complete?

  1. 9,000
  2. 9,700
  3. 10,500
  4. 12,000
Show answer & solution

Answer: (C) 10,500

9,000 + 1,500.

Question 13

What is the main difference between the FIFO and weighted average methods in process costing?

  1. Weighted average combines opening WIP costs with current costs, while FIFO keeps them separate
  2. Weighted average ignores opening WIP
  3. FIFO ignores closing WIP
  4. They always give the same result
Show answer & solution

Answer: (A) Weighted average combines opening WIP costs with current costs, while FIFO keeps them separate

FIFO shows current-period performance more clearly.

Question 14

What is normal loss in process costing?

  1. A loss due to inefficiency
  2. An expected, unavoidable loss whose cost is absorbed by good output
  3. A loss charged to profit and loss
  4. A gain
Show answer & solution

Answer: (B) An expected, unavoidable loss whose cost is absorbed by good output

Its scrap value reduces process cost.

Question 15

How is abnormal loss valued in process costing?

  1. At scrap value only
  2. At zero
  3. At selling price
  4. At the same cost per unit as good output, then written off to costing profit and loss
Show answer & solution

Answer: (D) At the same cost per unit as good output, then written off to costing profit and loss

This keeps inefficiency out of product cost.

Question 16

What is an abnormal gain?

  1. The amount by which actual loss is less than normal loss
  2. A scrap sale
  3. A loss above normal
  4. A profit on sales
Show answer & solution

Answer: (A) The amount by which actual loss is less than normal loss

It is credited to costing profit and loss.

Question 17

What is the cost per unit if input is 10,000 kg costing Rs 191,000, normal loss is 5% with scrap value Rs 2 per kg?

  1. Rs 19
  2. Rs 20.10
  3. Rs 19.10
  4. Rs 20
Show answer & solution

Answer: (D) Rs 20

(191,000 − 1,000) ÷ 9,500 expected units.

Question 18

What is the abnormal loss if input is 10,000 kg, normal loss is 5% and actual output is 9,300 kg?

  1. 200 kg
  2. 300 kg
  3. 500 kg
  4. 700 kg
Show answer & solution

Answer: (A) 200 kg

Expected output 9,500 − actual 9,300.

Question 19

What is normal spoilage according to Horngren's cost accounting?

  1. Spoilage of finished goods in transit
  2. Spoilage inherent in a production process even under efficient operating conditions
  3. Spoilage due to carelessness
  4. Spoilage that can always be avoided
Show answer & solution

Answer: (B) Spoilage inherent in a production process even under efficient operating conditions

Its cost is part of the cost of good units.

Question 20

How is the cost of abnormal spoilage treated?

  1. Recognised as a loss in the period it is detected
  2. Added to good units
  3. Added to inventory
  4. Ignored
Show answer & solution

Answer: (A) Recognised as a loss in the period it is detected

It is not expected under efficient operations.

Question 21

What is rework?

  1. Units lost by evaporation
  2. Normal waste
  3. Units that do not meet standards but are reworked and sold as good finished goods
  4. Scrap sold for cash
Show answer & solution

Answer: (C) Units that do not meet standards but are reworked and sold as good finished goods

Rework costs may be normal or abnormal.

Question 22

Why does the inspection point matter in spoilage accounting?

  1. It has no effect
  2. Normal spoilage cost is assigned to units that have passed the inspection point
  3. It decides selling price
  4. It sets wage rates
Show answer & solution

Answer: (B) Normal spoilage cost is assigned to units that have passed the inspection point

Units not yet inspected bear no spoilage cost.

Question 23

How are transferred-in costs treated in a subsequent process?

  1. As overheads
  2. As abnormal loss
  3. As selling costs
  4. Like materials added at the start of that process
Show answer & solution

Answer: (D) Like materials added at the start of that process

They are 100% complete for the next process.

Question 24

What is the cost of 8,000 completed units if cost per equivalent unit is Rs 30 for materials and Rs 20 for conversion?

  1. Rs 160,000
  2. Rs 400,000
  3. Rs 240,000
  4. Rs 484,000
Show answer & solution

Answer: (B) Rs 400,000

8,000 × (30 + 20).

Question 25

What is the value of 2,000 closing units 100% complete for materials (Rs 30 per unit) and 60% complete for conversion (Rs 20 per unit)?

  1. Rs 84,000
  2. Rs 60,000
  3. Rs 24,000
  4. Rs 100,000
Show answer & solution

Answer: (A) Rs 84,000

2,000 × 30 + 1,200 × 20.

Question 26

What is economic batch quantity?

  1. The largest batch possible
  2. The annual demand
  3. The batch size that minimises the total of set-up costs and inventory holding costs
  4. The smallest batch possible
Show answer & solution

Answer: (C) The batch size that minimises the total of set-up costs and inventory holding costs

It is similar in idea to EOQ.

Question 27

What is a cost-plus contract?

  1. A contract with penalty only
  2. A contract without profit
  3. A fixed-price contract
  4. A contract where the price is the actual cost plus an agreed profit
Show answer & solution

Answer: (D) A contract where the price is the actual cost plus an agreed profit

Common in government contracts.

Question 28

What is retention money in contract costing?

  1. A penalty for delay
  2. Interest on loans
  3. A part of the certified amount withheld by the client until the work proves satisfactory
  4. An advance payment
Show answer & solution

Answer: (C) A part of the certified amount withheld by the client until the work proves satisfactory

It is released after the maintenance period.

Question 29

What is an escalation clause in a contract?

  1. A penalty clause
  2. A clause allowing the price to rise if specified costs increase
  3. A clause fixing the price
  4. A tax clause
Show answer & solution

Answer: (B) A clause allowing the price to rise if specified costs increase

It protects the contractor from inflation.

Question 30

What is service (operating) costing?

  1. Costing applied to services such as transport, hospitals and power generation
  2. Costing of contracts
  3. Costing of batches
  4. Costing of jobs
Show answer & solution

Answer: (A) Costing applied to services such as transport, hospitals and power generation

Composite cost units are often used.

Question 31

What is the cost per passenger-kilometre if total transport cost is Rs 450,000 for 150,000 passenger-kilometres?

  1. Rs 300
  2. Rs 0.33
  3. Rs 30
  4. Rs 3
Show answer & solution

Answer: (D) Rs 3

450,000 ÷ 150,000.

Question 32

Which is a composite cost unit?

  1. Litre
  2. Kilogram
  3. Unit of output
  4. Tonne-kilometre
Show answer & solution

Answer: (D) Tonne-kilometre

It combines two measures.

Question 33

Which cost unit is commonly used in hospitals?

  1. Passenger-kilometre
  2. Kilowatt-hour
  3. Patient-day
  4. Tonne-kilometre
Show answer & solution

Answer: (C) Patient-day

It measures one patient for one day.

Question 34

Which cost unit is used in electricity generation?

  1. Patient-day
  2. Kilowatt-hour
  3. Bed-night
  4. Tonne-kilometre
Show answer & solution

Answer: (B) Kilowatt-hour

WAPDA and power companies measure output this way.

Question 35

How is spoilage attributable to a specific job's demanding specifications treated in job costing?

  1. It is charged to that specific job
  2. It is ignored
  3. It is credited to sales
  4. It is spread over all jobs
Show answer & solution

Answer: (A) It is charged to that specific job

Spoilage common to all jobs goes to overhead.

Question 36

What is operation costing?

  1. Costing each operation or stage in a continuous production process
  2. Costing a service
  3. Costing a contract
  4. Costing a single job
Show answer & solution

Answer: (A) Costing each operation or stage in a continuous production process

It is a refined form of process costing.

Question 37

What is unit (output) costing?

  1. Costing of contracts
  2. Costing used where a single homogeneous product is made, such as bricks
  3. Costing of custom jobs
  4. Costing of services
Show answer & solution

Answer: (B) Costing used where a single homogeneous product is made, such as bricks

Cost per unit is total cost ÷ output.

Question 38

What is uniform costing?

  1. Using tax rules for costing
  2. Using one rate for all costs
  3. Using the same costing principles by different firms in the same industry
  4. Using no costing system
Show answer & solution

Answer: (C) Using the same costing principles by different firms in the same industry

It allows inter-firm comparison.

Question 39

What does "work certified" mean in contract costing?

  1. Work not yet started
  2. Work rejected
  3. Work done free of charge
  4. The value of work completed and approved by the client's engineer or architect
Show answer & solution

Answer: (D) The value of work completed and approved by the client's engineer or architect

Progress payments are based on it.

Question 40

What happens to the output of one process in multi-process manufacturing?

  1. It is scrapped
  2. It becomes the input of the next process
  3. It is ignored
  4. It is always sold
Show answer & solution

Answer: (B) It becomes the input of the next process

Costs accumulate through processes.